East Cleveland Road Solar

☀ SolarIPP Non-CHP3 MW capacity
Capacity3 MWnameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameEast Cleveland Road Solar
OperatorRpca Solar 7, Llc
CityEl Nido
CountyMerced County
StateCalifornia
ZIP95317
Coordinates37.12497, -120.45747

Generators (1)

IDTechnologyFuelCapacityStatusOnline
ECLESolar PhotovoltaicSolar3.0 MWTesting

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

What this means

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Merced County