Electric generating plantEIA plant no. 68808

Dos Palos Cooperative Gin

Type
Solar Photovoltaic
Nameplate capacity
1.0 MW
Units
1
In service since
2022
Operator
A2B Development LLC dba Mars Energy Development
Location
Dos Palos, Merced County, California
Rated 1777th largest in California · 13806th of 14,761 in the U.S. · by nameplate

Dos Palos Cooperative Gin is a solar power plant in California with a nameplate capacity of 1.0 MW.

The 1.0 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomassBattery Storage

Location

Address7870 Hutchins Rd
CityDos Palos
CountyMerced County
StateCalifornia
ZIP93620
Coordinates37.08391, -120.63443
OperatorA2B Development LLC dba Mars Energy Development

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
P1001Solar PhotovoltaicSolar1.0 MWOperating2022

Ownership

OwnerLocationShare
Dos Palos Cooperative GinDos Palos, CA10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Merced County

View all plants in Merced County →

Explore more