Electric generating plantEIA plant no. 68518

Merced 2 BESS

Type
Batteries
Nameplate capacity
2.0 MW
Units
1
Operator
ZGlobal Inc
Location
Dos Palos, Merced County, California
Rated 1404th largest in California · 11103rd of 14,761 in the U.S. · by nameplate

Merced 2 BESS is a battery storage power plant in California with a nameplate capacity of 2.0 MW.

The 2.0 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricSolarBiomassBattery Storage

Location

Address19645 Aubrey Avenue
CityDos Palos
CountyMerced County
StateCalifornia
ZIP93320
Coordinates37.00093, -120.66483
OperatorZGlobal Inc

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
MRC2BBatteriesBattery2.0 MWTesting—

Ownership

OwnerLocationShare
Western Grid Development, LLCFolsom, CA10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Battery Storage plants

Battery storage facilities don't generate electricity — they store it. They charge from the grid (often from solar during the day) and discharge during peak demand or to firm up renewables. EIA classifies them as power plants because they connect to the grid like one.