Electric generating plantEIA plant no. 60386

RE Garland A

Type
Solar Photovoltaic
Nameplate capacity
20.2 MW
Units
1
In service since
2016
Operator
Southern Power Co
Location
Rosamond, Kern County, California
Rated 634th largest in California · 4965th of 14,761 in the U.S. · by nameplate

RE Garland A is a solar power plant in California with a nameplate capacity of 20.2 MW. It generates roughly 47.9k MWh per year — enough to power about 4,563 average U.S. homes.

Its capacity factor of 27% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, RE Garland A could make 177.0k MWh. In 2023 it made 47.9k MWh — the same as running at full power 27 hours in every 100.

Nameplate, full year177.0k MWh20.2 MW × 8,760 hours
Actually generated47.9k MWhEPA eGRID, 2023 · ≈4,563 homes

Peaking or variableCapacity factor 27%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

WindSolarBattery Storage

Location

Address21505 Gaskell Road
CityRosamond
CountyKern County
StateCalifornia
ZIP93560
Coordinates34.82145, -118.49741
OperatorSouthern Power Co

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PV1Solar PhotovoltaicSolar20.2 MWOperating2016

Ownership

OwnerLocationShare
RE Garland A LLCAtlanta, GA10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator