Re Gaskell West 2 Llc

☀ SolarIPP Non-CHP45 MW capacity

464th largest plant in California · 3784th nationally

Re Gaskell West 2 Llc is a solar power plant in California with a nameplate capacity of 45.0 MW. It generates roughly 89.0k MWh per year — enough to power about 8,472 average U.S. homes.

Its capacity factor of 23% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%23%
Peaking — intermittent or backup
Capacity45 MWnameplate
Annual Generation89.0k MWhEPA eGRID
Capacity Factor23%of theoretical max
Annual CO₂metric tons

Location

Plant NameRe Gaskell West 2 Llc
OperatorRe Gaskell West Llc
CityRosamond
CountyKern County
StateCalifornia
ZIP93560
Coordinates34.83494, -118.55118

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricWindSolarBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
PV2Solar PhotovoltaicSolar45.0 MWOperating2023

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator