Electric generating plantEIA plant no. 61016

Stafford St Solar 1 CSG

Type
Solar Photovoltaic
Nameplate capacity
2.0 MW
Units
1
In service since
2017
Operator
Stafford St Solar 1, LLC
Location
Leicester, Worcester County, Massachusetts
Rated 413th largest in Massachusetts · 11103rd of 14,761 in the U.S. · by nameplate

Stafford St Solar 1 CSG is a solar power plant in Massachusetts with a nameplate capacity of 2.0 MW. It generates roughly 11.6k MWh per year — enough to power about 1,105 average U.S. homes.

Its capacity factor of 66% puts it in the middle range — running steadily but not full-time.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Stafford St Solar 1 CSG could make 17.5k MWh. In 2023 it made 11.6k MWh — the same as running at full power 66 hours in every 100.

Nameplate, full year17.5k MWh2.0 MW × 8,760 hours
Actually generated11.6k MWhEPA eGRID, 2023 · ≈1,105 homes

Mid-meritCapacity factor 66%. It runs much of the time, but not all of it.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Location

Address466 Stafford St
CityLeicester
CountyWorcester County
StateMassachusetts
ZIP01611
Coordinates42.22404, -71.87065
OperatorStafford St Solar 1, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
STAF1Solar PhotovoltaicSolar2.0 MWOperating2017

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Worcester County

View all plants in Worcester County →

Explore more