1598th largest plant in California · 12185th nationally
Tejon Castac Water District Solar is a solar power plant in California with a nameplate capacity of 1.3 MW.
| Plant Name | Tejon Castac Water District Solar |
|---|---|
| Operator | Ctmw Solar, Llc |
| City | Arvin |
| County | Kern County |
| State | California |
| ZIP | 93203 |
| Coordinates | 35.00090, -118.89830 |
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| ID | Technology | Fuel | Capacity | Status | Online |
|---|---|---|---|---|---|
| 17180 | Solar Photovoltaic | Solar | 1.3 MW | Operating | 2024 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | California Independent System Operator |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.