Electric generating plantEIA plant no. 69451

West Camp Wind Farm

Type
Onshore Wind Turbine
Nameplate capacity
500 MW
Units
1
Operator
AES Clean Energy
Location
Heber, Navajo County, Arizona
Rated 33rd largest in Arizona · 743rd of 14,761 in the U.S. · by nameplate

West Camp Wind Farm is a wind power plant in Arizona with a nameplate capacity of 500 MW.

The 500 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

WindBiomass

Location

Address5301 West Camp Road
CityHeber
CountyNavajo County
StateArizona
ZIP85298
Coordinates34.73569, -110.42490
OperatorAES Clean Energy

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
WCAMPOnshore Wind TurbineWind500 MWUnder Construction—

Grid context

NERC RegionWECC
Balancing AuthorityArizona Public Service Company

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.