ZPD-PT Solar Project 2017-038 Hybrid LLC is a solar power plant in Massachusetts with a nameplate capacity of 8.5 MW. It generates roughly 7.5k MWh per year — enough to power about 710 average U.S. homes.
Its capacity factor of 10% reflects intermittent or peaking operation.
Run flat out every hour of the year, ZPD-PT Solar Project 2017-038 Hybrid LLC could make 74.5k MWh. In 2023 it made 7.5k MWh — the same as running at full power 10 hours in every 100.
Peaking or variableCapacity factor 10%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 438 Old Union Turnpike |
|---|---|
| City | Lancaster |
| County | Worcester County |
| State | Massachusetts |
| ZIP | 01523 |
| Coordinates | 42.51600, -71.67340 |
| Operator | AES Distributed Energy |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| DRAPV | Solar Photovoltaic | Solar | 5.0 MW | Operating | 2021 |
| DRAES | Batteries | Battery | 3.5 MW | Operating | 2021 |
| NERC Region | NPCC |
|---|---|
| Balancing Authority | ISO New England Inc. |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.