Digital Fortress - Portland 1 is a data center run by Digital Fortress, Inc in Portland, Multnomah County, Oregon. Its power comes off the Northwest grid (Portland General Electric), which runs on 39% hydroelectric, 25% natural gas and 16% coal.
This data centerOther data centersPower plants (colored by fuel)
| Address | 511 Southwest 10th Avenue, Portland OR 97205 |
|---|---|
| County | Multnomah County, Oregon |
| Coordinates | 45.52126, -122.68175 |
| On OpenStreetMap | node/13746843366 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Northwest grid region, and the county's largest utility is on the Portland General Electric grid. In 2023, the region's electricity was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind.
Each megawatt-hour carried about 631 lb of CO₂, 18% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Portland General Electric Co | 13.9¢ | 8.8¢ |
| PacifiCorp | 10.6¢ | 10.1¢ |
| Columbia River Peoples Ut Dist | 9.1¢ | 5.4¢ |
| Bonneville Power Administration | 4.2¢ | — |
Utilities that report serving Multnomah County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Oregon Convention Center | Solar | 1.4 MW | 1.0 mi |
| Goodling Community Solar | Solar | 1.0 MW | 5.3 mi |
| Seaside BESS | Battery Storage | 200 MW | 8.1 mi |
| River Road Gen Plant | Natural Gas | 248 MW | 9.1 mi |
| Durham AWTF | Biomass | 1.6 MW | 9.3 mi |
| Sullivan | Hydroelectric | 15.4 MW | 11.9 mi |
| Sundial (Troutdale) BESS | Battery Storage | 200 MW | 12.9 mi |
| Constable BESS | Battery Storage | 75.0 MW | 12.9 mi |
| Coffee Creek BESS | Battery Storage | 17.0 MW | 13.3 mi |
| SulusSolar17 | Solar | 3.1 MW | 16.9 mi |
The largest power plant within 50 miles is Bonneville, a 1,162 MW hydroelectric plant 37 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| Pittock Block | 0.9 ac | 0.0 mi |
| The Pittock Internet Exchange | — | 0.1 mi |
| H5 DC - Portland | — | 0.7 mi |
Data centers in Oregon · Data centers in Multnomah County · All Digital Fortress, Inc data centers · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.