Goodling Community Solar is a solar power plant in Oregon with a nameplate capacity of 1.0 MW.
The 1.0 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 9110 NE Sunderland Ave |
|---|---|
| City | Portland |
| County | Multnomah County |
| State | Oregon |
| ZIP | 97211 |
| Coordinates | 45.59000, -122.63451 |
| Operator | Bonneville Environmental Foundation (BEF) |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| GCS1 | Solar Photovoltaic | Solar | 1.0 MW | Operating | 2025 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | PacifiCorp - West |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| H5 DC - Portland | 4.7 mi |
| The Pittock Internet Exchange | 5.2 mi |
| Pittock Block | 5.2 mi |
| Digital Fortress - Portland 1 | 5.3 mi |
| Digital Fortress - Portland 2 | 10.4 mi |
| Digital Fortress - Portland 3 | 10.5 mi |
| Verizon Hillsboro (Tanasbourne) Data Center | 12.4 mi |
| Data Center | 12.4 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map