Verizon Hillsboro (Tanasbourne) Data Center

Verizon Hillsboro (Tanasbourne) Data Center is a data center run by Verizon Business in Hillsboro, Washington County, Oregon. It is mapped as 1 building covering about 1.4 acres (61,000 sq ft). Its power comes off the Northwest grid (Portland General Electric), which runs on 39% hydroelectric, 25% natural gas and 16% coal.

OperatorVerizon Businessas mapped
Roof area1.4 ac1 building
Grid CO₂631 lbper MWh, NWPP region
Nearest plant3.1 miConstable BESS

Location

This data centerOther data centersPower plants (colored by fuel)

Address9450 Northeast Tanasbourne Drive, Hillsboro OR 97124
CountyWashington County, Oregon
Coordinates45.54462, -122.88225
On OpenStreetMapway/331132308

What powers Verizon Hillsboro (Tanasbourne) Data Center

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Northwest grid region, and the county's largest utility is on the Portland General Electric grid. In 2023, the region's electricity was 39% hydroelectric, 25% natural gas, 16% coal and 12% wind.

Each megawatt-hour carried about 631 lb of CO₂, 18% cleaner than the U.S. grid as a whole (765 lb).

Hydroelectric 39%Natural Gas 25%Coal 16%Wind 12%Solar 3%Nuclear 3%

Share of electricity generated in EPA's Northwest grid region (NWPP) in 2023, from eGRID. 269 TWh from 808 plants.

Utilities that serve Washington County

UtilityTypeGridBusiness rateIndustrial rate
Portland General Electric CoInvestor OwnedPortland General Electric13.9¢8.8¢
City of Forest GroveMunicipalBonneville Power Administration9.0¢7.9¢
Bonneville Power AdministrationFederalBonneville Power Administration4.2¢—

Utilities that report serving Washington County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Constable BESSBattery Storage75.0 MW3.1 mi
Seaside BESSBattery Storage200 MW6.9 mi
MilfordSolar ORSolar3.0 MW8.3 mi
River Road Gen PlantNatural Gas248 MW10.5 mi
Oregon Convention CenterSolar1.4 MW10.7 mi
Durham AWTFBiomass1.6 MW11.4 mi
Goodling Community SolarSolar1.0 MW12.4 mi
O'Neill Creek SolarSolar2.2 MW13.0 mi
Coffee Creek BESSBattery Storage17.0 MW14.8 mi
SullivanHydroelectric15.4 MW18.3 mi

The largest power plant within 50 miles is Bonneville, a 1,162 MW hydroelectric plant 46 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Digital Realty PDX10 Data CenterDigital Realty1.6 ac0.5 mi
TGN HillsboroTata Communications0.5 ac0.6 mi
Flexential Portland - Hillsboro 1Flexential1.9 ac0.6 mi
OracleOperator not recorded1.5 ac0.7 mi
Stack Infrastructure - POR02Stack Infrastructure4.9 ac0.8 mi
Data CenterOregon Health & Science University0.6 ac1.3 mi
EdgeConneX - Portland POR03EdgeConneX1.9 ac1.7 mi
Flexential Portland - Hillsboro 2Flexential4.9 ac1.9 mi
Stack Infrastructure - POR01Stack Infrastructure2.1 ac2.2 mi
Digital Realty PDX11 Data CenterDigital Realty13 ac2.4 mi
QTS Data Center - Hillsboro 1Quality Technology Services3.6 ac2.4 mi
Adobe Data CenterOperator not recorded2.6 ac2.4 mi
QTS Data Center - Hillsboro 3 under constructionQuality Technology Services—2.6 mi
QTS Data Center - Hillsboro 2Quality Technology Services16 ac2.6 mi
NTT RagingWire DC - HillsboroNTT11 ac2.7 mi

And 7 more within 5 miles.

More

Data centers in Oregon · Data centers in Washington County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me