Electric generating plantEIA plant no. 67711

Seaside BESS

Type
Batteries
Nameplate capacity
200 MW
Units
1
In service since
2025
Operator
Portland General Electric Co
Location
Portland, Multnomah County, Oregon
Rated 23rd largest in Oregon · 1574th of 14,761 in the U.S. · by nameplate

Seaside BESS is a battery storage power plant in Oregon with a nameplate capacity of 200 MW.

The 200 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomassBattery Storage

Location

Address10350 N Time Oil Rd.
CityPortland
CountyMultnomah County
StateOregon
ZIP97203
Coordinates45.61530, -122.78111
OperatorPortland General Electric Co

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
SESD1BatteriesBattery200 MWOperating2025

Grid context

NERC RegionWECC
Balancing AuthorityPortland General Electric Company

About Battery Storage plants

Battery storage facilities don't generate electricity — they store it. They charge from the grid (often from solar during the day) and discharge during peak demand or to firm up renewables. EIA classifies them as power plants because they connect to the grid like one.

Other plants in Multnomah County

View all plants in Multnomah County →

Data centers near Seaside BESS

Data centerOperatorDistance
Verizon Hillsboro (Tanasbourne) Data CenterVerizon Business6.9 mi
Flexential Portland - Hillsboro 1Flexential7.0 mi
Digital Realty PDX10 Data CenterDigital Realty7.1 mi
TGN HillsboroTata Communications7.2 mi
Stack Infrastructure - POR02Stack Infrastructure7.3 mi
QTS Data Center - Hillsboro 3 under constructionQuality Technology Services7.3 mi
Digital Realty PDX11 Data CenterDigital Realty7.4 mi
OracleNot recorded7.4 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more