Power Plants Near 85532 — Claypool, AZ
15 power plants within 50 miles of ZIP 85532 (Claypool, Arizona). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 33.4154, -110.8149 · County: Gila
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 26.7 mi | Roosevelt Roosevelt, AZ | Hydroelectric | 36 MW | Salt River Project |
| 32.8 mi | Horse Mesa Apache Junction, AZ | Hydroelectric | 130 MW | Salt River Project |
| 36.5 mi | Box Canyon (Az) Florence, AZ | Battery Storage | — | Boca Bn, Llc |
| 37.4 mi | Mormon Flat Apache Junction, AZ | Hydroelectric | 64 MW | Salt River Project |
| 39.3 mi | Bonnybrooke Pv Florence, AZ | Solar | 50 MW | Apple, Inc |
| 42.5 mi | Poseidon Solar, Llc Globe, AZ | Solar | 20 MW | Axium Arizona Renewables, Llc |
| 42.6 mi | Copper Crossing Energy And Research Cent Florence, AZ | Natural Gas | 100 MW | Salt River Project |
| 42.8 mi | Punkin Center Battery Storage Tonto Basin, AZ | Other Fossil | 2 MW | Arizona Public Service Co |
| 42.8 mi | Stewart Mountain Phoenix, AZ | Hydroelectric | 13 MW | Salt River Project |
| 44.2 mi | Sandstone Solar Florence, AZ | Solar | 45 MW | Aes Distributed Energy |
| 45.6 mi | Pediment Bess I Mesa, AZ | Battery Storage | — | Pediment Bess I Llc |
| 45.6 mi | Banner Solar Ironwood Queen Creek, AZ | Solar | 1 MW | Banner Solar Ironwood Llc |
| 45.7 mi | Mesa Carport Pv Mesa, AZ | Solar | 5 MW | Apple, Inc |
| 45.7 mi | Mesa Solar Array Mesa, AZ | Solar | — | Apple, Inc |
| 47.1 mi | Queen Creek Solar Farm Queen Creek, AZ | Solar | 19 MW | Siete Solar Llc |
Power generation near this area
There are 15 power plants within 50 miles of Claypool, Arizona (ZIP 85532), with a combined 484 MW of nameplate capacity. Solar is the most common fuel type in this area with 7 of the 15 nearby plants. The closest plant is Roosevelt at 26.7 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Arizona, visit the Arizona state page.
← Search a different location · Printable proximity report →