Power Plants Near 95229 — Douglas Flat, CA
100 power plants within 50 miles of ZIP 95229 (Douglas Flat, California). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 38.1144, -120.4538 · County: Calaveras
| Distance | Plant | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| 2.3 mi | Murphys Murphys, CA | Hydroelectric | 4 MW | Utica Water & Power Authority |
| 4.5 mi | Collierville Powerhouse Murphys, CA | Hydroelectric | 253 MW | Northern California Power Agny |
| 4.8 mi | Stanislaus Vallecito, CA | Hydroelectric | 82 MW | Pacific Gas & Electric Co. |
| 5.5 mi | Angels Angels Camp, CA | Hydroelectric | 1 MW | Utica Water & Power Authority |
| 9.0 mi | Phoenix Sonora, CA | Hydroelectric | 2 MW | Pacific Gas & Electric Co. |
| 12.3 mi | New Melones Jamestown, CA | Hydroelectric | 300 MW | U S Bureau of Reclamation |
| 12.6 mi | Sierra Pacific Sonora Standard, CA | Biomass | 8 MW | Sierra Pacific Industries |
| 16.0 mi | Sierra Pacific Chinese Camp Chinese Camp, CA | Solar | 4 MW | Sierra Pacific Industries |
| 16.0 mi | Sonora 1 Jamestown, CA | Solar | 2 MW | CleanCapital Holdings |
| 16.6 mi | Sierra Energy Storage, LLC Jamestown, CA | Battery Storage | 10 MW | Engie North America |
| 16.7 mi | Pacific-Ultrapower Chinese Station Jamestown, CA | Biomass | 25 MW | IHI Power Services Corp |
| 17.2 mi | Sand Bar Power Plant Stanislaus Ntl. Fores, CA | Hydroelectric | 16 MW | Tri-Dam Power Authority |
| 18.4 mi | Tulloch Jamestown, CA | Hydroelectric | 30 MW | Oakdale&South San Joaquin Irrigation D. |
| 19.0 mi | Electra Jackson, CA | Hydroelectric | 103 MW | Pacific Gas & Electric Co. |
| 19.2 mi | Spring Gap Long Barn, CA | Hydroelectric | 6 MW | Pacific Gas & Electric Co. |
| 19.8 mi | New Hogan Power Plant Valley Springs, CA | Hydroelectric | 3 MW | Modesto Irrigation District |
| 21.4 mi | Beardsley None, CA | Hydroelectric | 10 MW | Oakdale&South San Joaquin Irrigation D. |
| 21.8 mi | West Point PH Pioneer, CA | Hydroelectric | 14 MW | Pacific Gas & Electric Co. |
| 22.0 mi | Moccasin Low Head Hydro Project Moccasin, CA | Hydroelectric | 3 MW | City & County of San Francisco - (CA) |
| 22.7 mi | Moccasin Moccasin, CA | Hydroelectric | 104 MW | City & County of San Francisco - (CA) |
| 23.2 mi | Tiger Creek Pioneer, CA | Hydroelectric | 52 MW | Pacific Gas & Electric Co. |
| 23.7 mi | Pardee Valley Springs, CA | Hydroelectric | 24 MW | East Bay Municipal Util Dist - (CA) |
| 24.6 mi | Donnells None, CA | Hydroelectric | 72 MW | Oakdale&South San Joaquin Irrigation D. |
| 26.5 mi | Ameresco San Joaquin Linden, CA | Biomass | 4 MW | Ameresco San Joaquin, LLC |
| 26.6 mi | Foothill Sanitary Landfill - Solar Array Linden, CA | Solar | 4 MW | Ameresco San Joaquin Solar LLC |
| 27.4 mi | Buena Vista Biomass Power Ione, CA | Biomass | 23 MW | Buena Vista Biomass LLC |
| 27.5 mi | Frankenheimer Power Plant Oakdale, CA | Hydroelectric | 5 MW | Turlock Irrigation District |
| 28.1 mi | Oaks HOA Ione, CA | Solar | 1 MW | Onyx Asset Services Group |
| 29.0 mi | Don Pedro La Grange, CA | Hydroelectric | 171 MW | Turlock Irrigation District |
| 29.1 mi | Woodward Power Plant Oakdale, CA | Hydroelectric | 3 MW | Turlock Irrigation District |
| 29.4 mi | Salt Springs Pioneer, CA | Hydroelectric | 42 MW | Pacific Gas & Electric Co. |
| 29.7 mi | Robert O Schulz Solar Farm Oakdale, CA | Solar | 2 MW | South San Joaquin Irr District |
| 30.5 mi | Dion R Holm Groveland, CA | Hydroelectric | 180 MW | City & County of San Francisco - (CA) |
| 30.7 mi | La Grange La Grange, CA | Hydroelectric | 5 MW | Turlock Irrigation District |
| 31.2 mi | Spicer Meadow Project Murphys, CA | Hydroelectric | 6 MW | Northern California Power Agny |
| 31.4 mi | North Central Valley Linden, CA | Other Fossil | 132 MW | North Central Valley Energy Storage, LLC |
| 31.8 mi | R C Kirkwood Groveland, CA | Hydroelectric | 133 MW | City & County of San Francisco - (CA) |
| 32.0 mi | Camanche Clements & Wallace, CA | Hydroelectric | 11 MW | East Bay Municipal Util Dist - (CA) |
| 32.0 mi | Upper Dawson La Grange, CA | Hydroelectric | 4 MW | Turlock Irrigation District |
| 35.2 mi | Da Silva Dairy Escalon, CA | Solar | 1 MW | A2B Development LLC dba Mars Energy Development |
| 35.6 mi | Turlock Lake Hickman, CA | Hydroelectric | 3 MW | Turlock Irrigation District |
| 36.5 mi | Central Valley Ag Power Oakdale, CA | Biomass | 2 MW | Central Valley Ag Power LLC |
| 37.4 mi | Kettleman Solar Project Lodi, CA | Solar | 1 MW | Ecos Energy LLC |
| 37.6 mi | Hickman Hickman, CA | Hydroelectric | 1 MW | Turlock Irrigation District |
| 37.8 mi | Bear Creek Solar (Lodi) Lodi, CA | Solar | 2 MW | Ecos Energy LLC |
| 38.0 mi | Exchequer Snelling, CA | Hydroelectric | 95 MW | Merced Irrigation District |
| 39.1 mi | Rancho Seco Solar, LLC Herald, CA | Solar | 11 MW | Rancho Seco Solar, LLC |
| 39.5 mi | Axium Modesto Solar Modesto, CA | Solar | 25 MW | Axium US Solar Holdings LLC |
| 39.5 mi | Cosumnes Power Plant Herald, CA | Other Fossil | 557 MW | Sacramento Municipal Util Dist |
| 39.6 mi | Rancho Seco Solar II, LLC Twin Cities, CA | Solar | 160 MW | Rancho Seco Solar II, LLC |
| 39.6 mi | ERock MID Claribel Generation Station Modesto, CA | Natural Gas | 48 MW | Enchanted Rock |
| 41.4 mi | Merced Falls Snelling, CA | Hydroelectric | 3 MW | Merced Irrigation District |
| 41.7 mi | McSwain Snelling, CA | Hydroelectric | 9 MW | Merced Irrigation District |
| 42.4 mi | McClure Modesto, CA | Natural Gas | 142 MW | Modesto Irrigation District |
| 42.8 mi | Donaghy-Stockton Stockton, CA | Solar | 1 MW | Donaghy Sales Inc. |
| 42.9 mi | Ameresco Forward Manteca, CA | Biomass | 4 MW | Ameresco Forward, LLC |
| 42.9 mi | Amazon - Stockton - Roof (SCK1) - (CA) Stockton, CA | Solar | 3 MW | Forefront Power, LLC |
| 44.0 mi | Parker Snelling, CA | Hydroelectric | 3 MW | Merced Irrigation District |
| 44.4 mi | Woodland Modesto, CA | Natural Gas | 199 MW | Modesto Irrigation District |
| 44.7 mi | AltaGas Ripon Energy Inc. Ripon, CA | Natural Gas | 50 MW | AltaGas Ripon Energy Inc. |
| 44.8 mi | Ripon Generation Station Ripon, CA | Natural Gas | 121 MW | Modesto Irrigation District |
| 44.8 mi | Cascade Energy Storage, LLC Stockton, CA | Battery Storage | 25 MW | Engie North America |
| 45.0 mi | Sacramento Soleil LLC Wilton, CA | Solar | 1 MW | EDF Renewable Asset Holdings, Inc. |
| 45.1 mi | El Dorado County Placerville, CA | Solar | 2 MW | SkyHigh 2 Solar |
| 45.6 mi | Manteca Land PV Manteca, CA | Solar | 1 MW | AES Distributed Energy |
| 45.7 mi | Deer Creek 2 Shingle Springs, CA | Solar | 1 MW | Altus Power America Management, LLC |
| 45.8 mi | SMUD at Van Conett Galt, CA | Solar | 3 MW | Sacramento PV Energy, LLC |
| 45.9 mi | Niagara Bottling Stockton Stockton, CA | Solar | 1 MW | ClearGen LLC |
| 46.0 mi | Enchanted Rock Lodi Lodi, CA | Natural Gas | 48 MW | Enchanted Rock |
| 46.1 mi | Lodi Lodi, CA | Natural Gas | 27 MW | Northern California Power Agny |
| 46.1 mi | RE Dillard 3 LLC Sloughhouse, CA | Solar | 3 MW | MN8 Energy LLC |
| 46.1 mi | RE Dillard 4 LLC Sloughhouse, CA | Solar | 0 MW | MN8 Energy LLC |
| 46.2 mi | RE Dillard 2 LLC Sloughhouse, CA | Solar | 3 MW | MN8 Energy LLC |
| 46.2 mi | CA Manteca 730 Spreckels Ave Manteca, CA | Battery Storage | 3 MW | Catalyze Manteca 730 Spreckels Avenue Microgrid LLC |
| 46.3 mi | Tesoro RV & Boat Storage Manteca, CA | Solar | 3 MW | Tesoro RV & Boat Storage |
| 46.4 mi | Stockton 6 - SLEBA202 Stockton, CA | Solar | 1 MW | Prologis Logistics Services Incorporated |
| 46.5 mi | RE Dillard 1 LLC Sloughhouse, CA | Solar | 3 MW | MN8 Energy LLC |
| 46.5 mi | SloughHouse Solar, LLC SloughHouse, CA | Solar | 50 MW | SloughHouse Solar, LLC |
| 47.2 mi | Almond Power Plant Modesto, CA | Natural Gas | 224 MW | Turlock Irrigation District |
| 47.5 mi | RE McKenzie 1 LLC Galt, CA | Solar | 5 MW | MN8 Energy LLC |
| 47.5 mi | RE McKenzie 2 LLC Galt, CA | Solar | 5 MW | MN8 Energy LLC |
| 47.5 mi | RE McKenzie 3 LLC Galt, CA | Solar | 5 MW | MN8 Energy LLC |
| 47.5 mi | RE McKenzie 4 LLC Galt, CA | Solar | 5 MW | MN8 Energy LLC |
| 47.5 mi | RE McKenzie 5 LLC Galt, CA | Solar | 5 MW | MN8 Energy LLC |
| 47.5 mi | RE McKenzie 6 LLC Galt, CA | Solar | 5 MW | MN8 Energy LLC |
| 47.6 mi | University of the Pacific Stockton, CA | Solar | 6 MW | The Greater Light USA LLC |
| 47.7 mi | Broadridge Cogen El Dorado Hills, CA | Natural Gas | 5 MW | Broadridge Customer Communications |
| 47.8 mi | El Dorado Pollock Pines, CA | Hydroelectric | 20 MW | El Dorado Irrigation District |
| 48.5 mi | White Rock/Slab Creek Placerville, CA | Hydroelectric | 269 MW | Sacramento Municipal Util Dist |
| 48.7 mi | Kiefer Landfill Generating Phase II Sloughhouse, CA | Natural Gas | 6 MW | NextEra Renewable Fuels, LLC |
| 48.7 mi | Kiefer Landfill Sloughhouse, CA | Biomass | 15 MW | Sacramento County of Dpt Waste |
| 48.7 mi | SMUD at Fleshman Galt, CA | Solar | 3 MW | Sacramento PV Energy, LLC |
| 48.8 mi | El Dorado Solar, LLC El Dorado Hills, CA | Solar | 2 MW | Altus Power America Management, LLC |
| 49.1 mi | Stockton Biomass Stockton, CA | Biomass | 54 MW | DTE Stockton LLC |
| 49.2 mi | Regional Wastewater Control Facility Stockton, CA | Biomass | 8 MW | City of Stockton MUD - (CA) |
| 49.4 mi | Chili Bar Placerville, CA | Hydroelectric | 8 MW | Sacramento Municipal Util Dist |
| 49.5 mi | Rock Creek LP Placerville, CA | Hydroelectric | 3 MW | Hydroland Omega LLC |
| 49.6 mi | Walnut Energy Center Turlock, CA | Natural Gas | 301 MW | Turlock Irrigation District |
| 49.6 mi | Camino Camino, CA | Hydroelectric | 158 MW | Sacramento Municipal Util Dist |
| 49.6 mi | Renew Solar ABC Sacramento LLC Sacramento, CA | Solar | 2 MW | Greenbacker Renewable Energy Corporation |
Power generation near this area
There are 100 power plants within 50 miles of Douglas Flat, California (ZIP 95229), with a combined 4,576 MW of nameplate capacity. Hydroelectric is the most common fuel type in this area with 39 of the 100 nearby plants. The closest plant is Murphys at 2.3 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in California, visit the California state page.
← Search a different location · Printable proximity report →