Power Plants Near 95305 — Big Oak Flat, CA
70 power plants within 50 miles of ZIP 95305 (Big Oak Flat, California). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 37.8235, -120.2582 · County: Tuolumne
| Distance | Plant | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| 2.4 mi | Moccasin Moccasin, CA | Hydroelectric | 104 MW | City & County of San Francisco - (CA) |
| 3.0 mi | Moccasin Low Head Hydro Project Moccasin, CA | Hydroelectric | 3 MW | City & County of San Francisco - (CA) |
| 10.4 mi | Sierra Pacific Sonora Standard, CA | Biomass | 8 MW | Sierra Pacific Industries |
| 11.5 mi | Sierra Pacific Chinese Camp Chinese Camp, CA | Solar | 4 MW | Sierra Pacific Industries |
| 12.5 mi | Sierra Energy Storage, LLC Jamestown, CA | Battery Storage | 10 MW | Engie North America |
| 12.5 mi | Pacific-Ultrapower Chinese Station Jamestown, CA | Biomass | 25 MW | IHI Power Services Corp |
| 12.5 mi | Don Pedro La Grange, CA | Hydroelectric | 171 MW | Turlock Irrigation District |
| 14.7 mi | La Grange La Grange, CA | Hydroelectric | 5 MW | Turlock Irrigation District |
| 14.9 mi | Phoenix Sonora, CA | Hydroelectric | 2 MW | Pacific Gas & Electric Co. |
| 15.5 mi | Sonora 1 Jamestown, CA | Solar | 2 MW | CleanCapital Holdings |
| 16.5 mi | Exchequer Snelling, CA | Hydroelectric | 95 MW | Merced Irrigation District |
| 16.6 mi | Dion R Holm Groveland, CA | Hydroelectric | 180 MW | City & County of San Francisco - (CA) |
| 16.6 mi | Upper Dawson La Grange, CA | Hydroelectric | 4 MW | Turlock Irrigation District |
| 17.0 mi | New Melones Jamestown, CA | Hydroelectric | 300 MW | U S Bureau of Reclamation |
| 17.1 mi | R C Kirkwood Groveland, CA | Hydroelectric | 133 MW | City & County of San Francisco - (CA) |
| 19.3 mi | Tulloch Jamestown, CA | Hydroelectric | 30 MW | Oakdale&South San Joaquin Irrigation D. |
| 21.0 mi | McSwain Snelling, CA | Hydroelectric | 9 MW | Merced Irrigation District |
| 21.1 mi | Merced Falls Snelling, CA | Hydroelectric | 3 MW | Merced Irrigation District |
| 22.6 mi | Stanislaus Vallecito, CA | Hydroelectric | 82 MW | Pacific Gas & Electric Co. |
| 23.0 mi | Angels Angels Camp, CA | Hydroelectric | 1 MW | Utica Water & Power Authority |
| 23.2 mi | Collierville Powerhouse Murphys, CA | Hydroelectric | 253 MW | Northern California Power Agny |
| 23.5 mi | Turlock Lake Hickman, CA | Hydroelectric | 3 MW | Turlock Irrigation District |
| 24.6 mi | Murphys Murphys, CA | Hydroelectric | 4 MW | Utica Water & Power Authority |
| 25.7 mi | Sand Bar Power Plant Stanislaus Ntl. Fores, CA | Hydroelectric | 16 MW | Tri-Dam Power Authority |
| 26.0 mi | Parker Snelling, CA | Hydroelectric | 3 MW | Merced Irrigation District |
| 26.3 mi | Spring Gap Long Barn, CA | Hydroelectric | 6 MW | Pacific Gas & Electric Co. |
| 28.0 mi | Beardsley None, CA | Hydroelectric | 10 MW | Oakdale&South San Joaquin Irrigation D. |
| 30.0 mi | Frankenheimer Power Plant Oakdale, CA | Hydroelectric | 5 MW | Turlock Irrigation District |
| 30.1 mi | Hickman Hickman, CA | Hydroelectric | 1 MW | Turlock Irrigation District |
| 31.7 mi | Donnells None, CA | Hydroelectric | 72 MW | Oakdale&South San Joaquin Irrigation D. |
| 33.0 mi | UC Merced Solar Hybrid Merced, CA | Solar | 5 MW | MN8 Energy LLC |
| 33.1 mi | Broadway 3 - UC Merced 1 Merced, CA | Solar | 1 MW | MN8 Energy LLC |
| 34.0 mi | Woodward Power Plant Oakdale, CA | Hydroelectric | 3 MW | Turlock Irrigation District |
| 34.7 mi | Robert O Schulz Solar Farm Oakdale, CA | Solar | 2 MW | South San Joaquin Irr District |
| 35.3 mi | 2097 Helton Solar Project Merced, CA | Solar | 2 MW | Solarenewal LLC |
| 35.7 mi | Central Valley Ag Power Oakdale, CA | Biomass | 2 MW | Central Valley Ag Power LLC |
| 37.8 mi | New Hogan Power Plant Valley Springs, CA | Hydroelectric | 3 MW | Modesto Irrigation District |
| 39.2 mi | McClure Modesto, CA | Natural Gas | 142 MW | Modesto Irrigation District |
| 39.3 mi | Ameresco San Joaquin Linden, CA | Biomass | 4 MW | Ameresco San Joaquin, LLC |
| 39.6 mi | ERock MID Claribel Generation Station Modesto, CA | Natural Gas | 48 MW | Enchanted Rock |
| 39.8 mi | Foothill Sanitary Landfill - Solar Array Linden, CA | Solar | 4 MW | Ameresco San Joaquin Solar LLC |
| 40.3 mi | Mission Solar LLC Merced, CA | Solar | 2 MW | Ecos Energy LLC |
| 40.3 mi | Merced Solar LLC Merced, CA | Solar | 2 MW | Ecos Energy LLC |
| 40.7 mi | West Tambo Clean Power II Livingston, CA | Solar | 2 MW | West Tambo Clean Power II |
| 40.7 mi | Axium Modesto Solar Modesto, CA | Solar | 25 MW | Axium US Solar Holdings LLC |
| 41.3 mi | Da Silva Dairy Escalon, CA | Solar | 1 MW | A2B Development LLC dba Mars Energy Development |
| 41.6 mi | Electra Jackson, CA | Hydroelectric | 103 MW | Pacific Gas & Electric Co. |
| 41.7 mi | Spicer Meadow Project Murphys, CA | Hydroelectric | 6 MW | Northern California Power Agny |
| 41.9 mi | Walnut Energy Center Turlock, CA | Natural Gas | 301 MW | Turlock Irrigation District |
| 42.2 mi | Walnut Turlock, CA | Natural Gas | 50 MW | Turlock Irrigation District |
| 43.1 mi | City of Atwater NEM Atwater, CA | Solar | 2 MW | SoCore Energy LLC |
| 43.3 mi | Woodland Modesto, CA | Natural Gas | 199 MW | Modesto Irrigation District |
| 43.3 mi | Almond Power Plant Modesto, CA | Natural Gas | 224 MW | Turlock Irrigation District |
| 43.5 mi | North Central Valley Linden, CA | Other Fossil | 132 MW | North Central Valley Energy Storage, LLC |
| 44.0 mi | Pardee Valley Springs, CA | Hydroelectric | 24 MW | East Bay Municipal Util Dist - (CA) |
| 44.0 mi | Merced Pipeline Merced, CA | Solar | 4 MW | Maas Energy Works |
| 44.2 mi | West Point PH Pioneer, CA | Hydroelectric | 14 MW | Pacific Gas & Electric Co. |
| 45.1 mi | Tiger Creek Pioneer, CA | Hydroelectric | 52 MW | Pacific Gas & Electric Co. |
| 45.8 mi | El Nido Facility El Nido, CA | Biomass | 13 MW | Merced Power LLC |
| 46.6 mi | Salt Springs Pioneer, CA | Hydroelectric | 42 MW | Pacific Gas & Electric Co. |
| 47.3 mi | AltaGas Ripon Energy Inc. Ripon, CA | Natural Gas | 50 MW | AltaGas Ripon Energy Inc. |
| 47.3 mi | Ripon Generation Station Ripon, CA | Natural Gas | 121 MW | Modesto Irrigation District |
| 47.5 mi | Buena Vista Biomass Power Ione, CA | Biomass | 23 MW | Buena Vista Biomass LLC |
| 48.3 mi | Oaks HOA Ione, CA | Solar | 1 MW | Onyx Asset Services Group |
| 48.4 mi | Avenue 26 Solar Chowchilla, CA | Solar | 8 MW | RPCA Solar 1, LLC |
| 48.6 mi | Five H Farms Solar Array Merced, CA | Solar | 1 MW | Maas Energy Works |
| 48.7 mi | Adera Solar Chowchilla, CA | Solar | 20 MW | AES Distributed Energy |
| 49.5 mi | East Cleveland Road Solar El Nido, CA | Solar | 3 MW | RPCA Solar 7, LLC |
| 49.5 mi | Chowchilla II Chowchilla, CA | Natural Gas | 50 MW | California Power Holdings LLC |
| 49.5 mi | Ampersand Chowchilla Biomass LLC Chowchilla, CA | Biomass | 13 MW | Ampersand Chowchilla Biomass LLC |
Power generation near this area
There are 70 power plants within 50 miles of Big Oak Flat, California (ZIP 95305), with a combined 3,238 MW of nameplate capacity. Hydroelectric is the most common fuel type in this area with 33 of the 70 nearby plants. The closest plant is Moccasin at 2.4 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in California, visit the California state page.
← Search a different location · Printable proximity report →