Power Plants Near 97810 — Adams, OR
32 power plants within 50 miles of ZIP 97810 (Adams, Oregon). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 45.7674, -118.5625 · County: Umatilla
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 9.1 mi | Chopin Wind Llc Milton-Freewater, OR | Wind | 10 MW | Chopin Wind, Llc |
| 9.2 mi | Vansycle Ii Wind Energy Center Athena, OR | Wind | 102 MW | Fpl Energy Stateline Ii Inc |
| 10.1 mi | Schumann Wind Farm Milton-Freewater, OR | Wind | 8 MW | Chopin Wind, Llc |
| 12.2 mi | Combine Hills I Milton-Freewater, OR | Wind | 43 MW | Eurus Combine Hills I Llc |
| 12.2 mi | Eurus Combine Hills Turbine Ranch 2 Milton Freewater, OR | Wind | 66 MW | Eurus Combine Hills Ii Llc |
| 12.6 mi | Vansycle Touchet, OR | Wind | 25 MW | Esi Vansycle Partners Lp |
| 20.9 mi | Fpl Energy Vansycle Llc (Or) Touchet, OR | Wind | 123 MW | Fpl Energy Vansycle Llc |
| 26.4 mi | Fpl Energy Vansycle Llc (Wa) Touchet, WA | Wind | 177 MW | Fpl Energy Vansycle Llc |
| 26.7 mi | Twin Reservoirs Walla Walla, WA | Hydroelectric | 2 MW | Walla Walla City Of |
| 30.4 mi | Nolin Hills Nolin, OR | Solar | — | Nolin Hills Wind, Llc |
| 34.3 mi | Nine Canyon Kennewick, WA | Wind | 96 MW | Energy Northwest |
| 36.2 mi | Hermiston Power Partnership Hermiston, OR | Natural Gas | 689 MW | Hermiston Power Partnership |
| 36.6 mi | Ice Harbor Burbank, WA | Hydroelectric | 603 MW | Usace Northwestern Division |
| 37.4 mi | Mcnary Umatilla, OR | Hydroelectric | 991 MW | Usace Northwestern Division |
| 37.4 mi | Mcnary Dam Fish Attraction Project Plymouth, WA | Hydroelectric | 10 MW | Northern Wasco County Pud |
| 39.0 mi | Norwest Energy 9 Llc Pendleton, OR | Solar | 6 MW | Mn8 Energy Llc |
| 39.0 mi | Hermiston Generating Plant Hermiston, OR | Natural Gas | 621 MW | Hermiston Generating Co Lp |
| 40.8 mi | Oregon Trail Windfarm Llc Echo, OR | Wind | 10 MW | Echo 1 |
| 41.2 mi | Ward Butte Windfarm Llc Echo, OR | Wind | 7 MW | Echo 1 |
| 41.3 mi | Four Corners Windfarm Llc Echo, OR | Wind | 8 MW | Echo 2 |
| 41.7 mi | Butter Creek Power Llc Echo, OR | Wind | 5 MW | Odessa Energy Services Llc |
| 42.5 mi | Wheatridge East Wind Lexington, OR | Wind | — | Wheatridge East Wind Llc |
| 43.8 mi | Four Mile Canyon Windfarm Llc Echo, OR | Wind | 10 MW | Echo 2 |
| 44.1 mi | Wagon Trail Llc Echo, OR | Wind | 3 MW | Odessa Energy Services Llc |
| 44.2 mi | Big Top Llc Echo, OR | Wind | 2 MW | Odessa Energy Services Llc |
| 44.9 mi | Sand Ranch Windfarm Llc Echo, OR | Wind | 10 MW | Echo 1 |
| 45.3 mi | Pacific Canyon Windfarm Llc Echo, OR | Wind | 8 MW | Echo 1 |
| 45.9 mi | Orchard Windfarm 1, Llc Lexington, OR | Wind | 10 MW | Orchard Windfarm, Llc |
| 45.9 mi | Orchard Windfarm 2, Llc Lexington, OR | Wind | 10 MW | Orchard Windfarm, Llc |
| 45.9 mi | Orchard Windfarm 3, Llc Lexington, OR | Wind | 10 MW | Orchard Windfarm, Llc |
| 45.9 mi | Orchard Windfarm 4, Llc Lexington, OR | Wind | 10 MW | Orchard Windfarm, Llc |
| 49.6 mi | Sunstone Solar Ione, OR | Battery Storage | — | Sunstone Solar, Llc |
Power generation near this area
There are 32 power plants within 50 miles of Adams, Oregon (ZIP 97810), with a combined 3,675 MW of nameplate capacity. Wind is the most common fuel type in this area with 23 of the 32 nearby plants. The closest plant is Chopin Wind Llc at 9.1 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in Oregon, visit the Oregon state page.
← Search a different location · Printable proximity report →