Electric generating plantEIA plant no. 10398

Cleveland Works

Type
Other Gases
Nameplate capacity
102 MW
Units
3
In service since
1965–2022
Operator
Cleveland Cliffs
Location
Cleveland, Cuyahoga County, Ohio
Rated 57th largest in Ohio · 2676th of 14,761 in the U.S. · by nameplate

Cleveland Works is a other fossil power plant in Ohio with a nameplate capacity of 102 MW. It generates roughly 143.9k MWh per year — enough to power about 13,701 average U.S. homes.

Its capacity factor of 12% reflects intermittent or peaking operation. At 3237 lb CO₂/MWh, its emission rate sits above the national grid average of roughly 800 lb/MWh.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Cleveland Works could make 1.2M MWh. In 2023 it made 143.9k MWh — the same as running at full power 12 hours in every 100.

Nameplate, full year1.2M MWh137 MW × 8,760 hours
Actually generated143.9k MWhEPA eGRID, 2023 · ≈13,701 homes

In 2023 its nameplate was 137 MW (EPA eGRID). EIA's current inventory (EIA-860M) lists 102 MW operating.

Peaking or variableCapacity factor 12%. It runs only part of the time — when demand is high, or when the wind or sun allows.

Month by month in 2025

100% of nameplate0Jan: 37.1k MWh (49% of capacity)JFeb: 32.3k MWh (47% of capacity)FMar: 14.2k MWh (19% of capacity)MApr: 24.1k MWh (33% of capacity)AMay: 27.2k MWh (36% of capacity)MJun: 30.5k MWh (42% of capacity)JJul: 37.3k MWh (49% of capacity)JAug: 32.4k MWh (43% of capacity)ASep: 19.2k MWh (26% of capacity)SOct: 31.8k MWh (42% of capacity)ONov: 33.8k MWh (46% of capacity)NDec: 37.3k MWh (49% of capacity)D

Pale bars are each month's ceiling (102 MW nameplate × hours in the month). Filled bars are actual net generation reported to EIA Form 923.

How it works

A steam plant burning fuel

fuel insteamwater returns1boiler burns fuel2steam spins turbine3generator4cooling condenses steam
  1. A boiler burns fuel to turn water into high-pressure steam.
  2. The steam pushes through a turbine, spinning it thousands of times a minute.
  3. The turbine's shaft turns a generator, which sends power to the grid.
  4. Spent steam is cooled back into water — by a cooling tower, a lake or a river — and pumped back to the boiler.

Why the numbers look like this: a boiler and turbine this size take hours to bring up from cold, so steam plants were built to run steadily for long stretches. A steam plant with a low capacity factor is usually being held in reserve, or run only through the hottest and coldest weeks.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilWindSolarBiomassBattery Storage

Location

Address3060 Eggers Road
CityCleveland
CountyCuyahoga County
StateOhio
ZIP44105
Coordinates41.47390, -81.67280
OperatorCleveland Cliffs

Generators (3)

IDTechnologyFuelNameplate capacityStatusOnline
GENGOther GasesBlast Furnace Gas70.0 MWOperating2022
GENCOther GasesBlast Furnace Gas22.0 MWOut of Service2010
GENBOther GasesBlast Furnace Gas10.0 MWOperating1965

Emissions (annual)

CO₂232.9k metric tons
SO₂2 metric tons
NOₓ77 metric tons
CO₂ Rate3237 lb/MWh
U.S. grid average800 lb/MWhNatural gas combined-cycle average900 lb/MWhCoal plant average2,100 lb/MWhThis plant3,237 lb/MWh

Annual totals and CO₂ rate reported by EPA eGRID for 2023. Reference averages are approximate U.S.-wide figures from the same dataset.

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Other Fossil plants

Cleveland Works is a federally registered power generation facility in Ohio.

Other plants in Cuyahoga County

View all plants in Cuyahoga County →

Data centers near Cleveland Works

Data centerOperatorDistance
Lumen ClevelandNot recorded2.3 mi
H5 Data CenterH52.3 mi
T5@ClevelandT5 Data Centers7.0 mi
Involta IndependenceNot recorded8.1 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more