Electric generating plantEIA plant no. 69593

MCCo BESS Generating Facility

Type
Battery Storage
Nameplate capacity
3.6 MW
Units
2
In service since
2012
Operator
The Medical Center Company
Location
Cleveland, Cuyahoga County, Ohio
Rated 154th largest in Ohio · 9466th of 14,761 in the U.S. · by nameplate

MCCo BESS Generating Facility is a battery storage power plant in Ohio with a nameplate capacity of 3.6 MW.

The 3.6 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A reciprocating-engine plant

oil1pistons fire like a car engine2generator
  1. oil burns in cylinders, driving pistons — the same principle as a truck engine, much larger.
  2. The crankshaft turns a generator.
  3. Plants are built from several identical engines, so they can run one at a time or all together.

Why the numbers look like this: engines start in minutes and come in small blocks, so they show up at landfills, on islands and as backup or peaking units — places that need power in small, fast pieces.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilWindSolarBiomassBattery Storage

Location

Address11626 Mayfield Rd
CityCleveland
CountyCuyahoga County
StateOhio
ZIP44106
Coordinates41.30260, -81.36040
OperatorThe Medical Center Company

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
B020Petroleum LiquidsDistillate Oil1.8 MWStandby2012
B021Petroleum LiquidsDistillate Oil1.8 MWStandby2012

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Battery Storage plants

Battery storage facilities don't generate electricity — they store it. They charge from the grid (often from solar during the day) and discharge during peak demand or to firm up renewables. EIA classifies them as power plants because they connect to the grid like one.

Other plants in Cuyahoga County

View all plants in Cuyahoga County →

Data centers near MCCo BESS Generating Facility

Data centerOperatorDistance
Involta IndependenceNot recorded14.7 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more