Electric generating plantEIA plant no. 57613

LE Wind Turbine 1

Type
Onshore Wind Turbine
Nameplate capacity
2.5 MW
Units
1
In service since
2011
Operator
Lincoln Electric Company
Location
Euclid, Cuyahoga County, Ohio
Rated 178th largest in Ohio · 10573rd of 14,761 in the U.S. · by nameplate

LE Wind Turbine 1 is a wind power plant in Ohio with a nameplate capacity of 2.5 MW. It generates roughly 4.2k MWh per year — enough to power about 404 average U.S. homes.

Its capacity factor of 19% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, LE Wind Turbine 1 could make 21.9k MWh. In 2023 it made 4.2k MWh — the same as running at full power 19 hours in every 100.

Nameplate, full year21.9k MWh2.5 MW × 8,760 hours
Actually generated4.2k MWhEPA eGRID, 2023 · ≈404 homes

Peaking or variableCapacity factor 19%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

NuclearNatural GasCoalOilWindSolarBiomassBattery Storage

Location

Address22800 Saint Clair Avenue
CityEuclid
CountyCuyahoga County
StateOhio
ZIP44117
Coordinates41.58444, -81.52555
OperatorLincoln Electric Company

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
WTG1Onshore Wind TurbineWind2.5 MWOperating2011

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Cuyahoga County

View all plants in Cuyahoga County →

Data centers near LE Wind Turbine 1

Data centerOperatorDistance
Lumen ClevelandNot recorded8.8 mi
H5 Data CenterH59.8 mi
T5@ClevelandT5 Data Centers17.3 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more