Electric generating plantEIA plant no. 63436

Corriedale Wind Energy

Type
Onshore Wind Turbine
Nameplate capacity
52.5 MW
Units
1
In service since
2020
Operator
Black Hills Service Company LLC
Location
Cheyenne, Laramie County, Wyoming
Rated 39th largest in Wyoming · 3862nd of 14,761 in the U.S. · by nameplate

Corriedale Wind Energy is a wind power plant in Wyoming with a nameplate capacity of 52.5 MW. It generates roughly 203.9k MWh per year — enough to power about 19,414 average U.S. homes.

Its capacity factor of 44% puts it in the middle range — running steadily but not full-time.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Corriedale Wind Energy could make 459.9k MWh. In 2023 it made 203.9k MWh — the same as running at full power 44 hours in every 100.

Nameplate, full year459.9k MWh52.5 MW × 8,760 hours
Actually generated203.9k MWhEPA eGRID, 2023 · ≈19,414 homes

Mid-meritCapacity factor 44%. It runs much of the time, but not all of it.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasCoalWindSolar

Location

Address1877 Happy Jack Road
CityCheyenne
CountyLaramie County
StateWyoming
ZIP92009
Coordinates41.11330, -104.98401
OperatorBlack Hills Service Company LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
WTGOnshore Wind TurbineWind52.5 MWOperating2020

Ownership

OwnerLocationShare
Black Hills Power, Inc.Rapid City, SD6200.0%
Cheyenne Light Fuel & PowerRapid City, SD3800.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityWestern Area Power Administration - Rocky Mountain Region

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Laramie County

View all plants in Laramie County →

Data centers near Corriedale Wind Energy

Data centerOperatorDistance
Data center, Fe Warren AfbNot recorded4.0 mi
CYS42 DatacenterMicrosoft4.0 mi
Data center, Fe Warren AfbNot recorded4.4 mi
CYS41 DatacenterMicrosoft4.5 mi
NCAR-Wyoming Supercomputing CenterUniversity Corporation for Atmospheric Research4.6 mi
Data center, CheyenneNot recorded8.7 mi
Data center, CheyenneNot recorded10.8 mi
Data center, CheyenneNot recorded11.1 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more