Electric generating plantEIA plant no. 67026

Roundhouse Renewable Energy II

Type
Onshore Wind Turbine
Nameplate capacity
106 MW
Units
1
In service since
2023
Operator
Roundhouse Renewable Energy II, LLC
Location
Granite, Laramie County, Wyoming
Rated 30th largest in Wyoming · 2616th of 14,761 in the U.S. · by nameplate

Roundhouse Renewable Energy II is a wind power plant in Wyoming with a nameplate capacity of 106 MW. It generates roughly 6 MWh per year — enough to power about 0 average U.S. homes.

The 106 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasCoalWindSolar

Location

Address939 I-80 Service Road
CityGranite
CountyLaramie County
StateWyoming
ZIP82059
Coordinates41.05469, -104.99538
OperatorRoundhouse Renewable Energy II, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
RHIIOnshore Wind TurbineWind106 MWOperating2023

Grid context

NERC RegionWECC
Balancing AuthorityWestern Area Power Administration - Rocky Mountain Region

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Laramie County

View all plants in Laramie County →

Data centers near Roundhouse Renewable Energy II

Data centerOperatorDistance
Data center, Fe Warren AfbNot recorded6.5 mi
CYS42 DatacenterMicrosoft6.7 mi
Data center, Fe Warren AfbNot recorded6.9 mi
CYS41 DatacenterMicrosoft7.0 mi
NCAR-Wyoming Supercomputing CenterUniversity Corporation for Atmospheric Research7.2 mi
Data center, CheyenneNot recorded9.0 mi
Data center, CheyenneNot recorded10.9 mi
Data center, CheyenneNot recorded11.2 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map