Roundhouse Renewable Energy II is a wind power plant in Wyoming with a nameplate capacity of 106 MW. It generates roughly 6 MWh per year — enough to power about 0 average U.S. homes.
The 106 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 939 I-80 Service Road |
|---|---|
| City | Granite |
| County | Laramie County |
| State | Wyoming |
| ZIP | 82059 |
| Coordinates | 41.05469, -104.99538 |
| Operator | Roundhouse Renewable Energy II, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| RHII | Onshore Wind Turbine | Wind | 106 MW | Operating | 2023 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | Western Area Power Administration - Rocky Mountain Region |
Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.
| Data center | Distance |
|---|---|
| Data center, Fe Warren Afb | 6.5 mi |
| CYS42 Datacenter | 6.7 mi |
| Data center, Fe Warren Afb | 6.9 mi |
| CYS41 Datacenter | 7.0 mi |
| NCAR-Wyoming Supercomputing Center | 7.2 mi |
| Data center, Cheyenne | 9.0 mi |
| Data center, Cheyenne | 10.9 mi |
| Data center, Cheyenne | 11.2 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map