Electric generating plantEIA plant no. 63133

Roundhouse Wind Energy Project

Type
Onshore Wind Turbine
Nameplate capacity
226 MW
Units
3
In service since
2020
Operator
Roundhouse Renewable Energy, LLC
Location
Cheyenne, Laramie County, Wyoming
Rated 12th largest in Wyoming · 1426th of 14,761 in the U.S. · by nameplate

Roundhouse Wind Energy Project is a wind power plant in Wyoming with a nameplate capacity of 226 MW. It generates roughly 849.6k MWh per year — enough to power about 80,912 average U.S. homes.

Its capacity factor of 43% puts it in the middle range — running steadily but not full-time.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Roundhouse Wind Energy Project could make 2.0M MWh. In 2023 it made 849.6k MWh — the same as running at full power 43 hours in every 100.

Nameplate, full year2.0M MWh226 MW × 8,760 hours
Actually generated849.6k MWhEPA eGRID, 2023 · ≈80,912 homes

Mid-meritCapacity factor 43%. It runs much of the time, but not all of it.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasCoalWindSolar

Location

Address939 I-80 Service Road
CityCheyenne
CountyLaramie County
StateWyoming
ZIP82059
Coordinates41.09513, -105.10742
OperatorRoundhouse Renewable Energy, LLC

Generators (3)

IDTechnologyFuelNameplate capacityStatusOnline
82059Onshore Wind TurbineWind124 MWOperating2020
82060Onshore Wind TurbineWind79.0 MWOperating2020
82061Onshore Wind TurbineWind23.0 MWOperating2020

Grid context

NERC RegionWECC
Balancing AuthorityWestern Area Power Administration - Rocky Mountain Region

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Laramie County

View all plants in Laramie County →

Data centers near Roundhouse Wind Energy Project

Data centerOperatorDistance
Data center, Fe Warren AfbNot recorded10.5 mi
CYS42 DatacenterMicrosoft10.6 mi
Data center, Fe Warren AfbNot recorded10.9 mi
CYS41 DatacenterMicrosoft11.1 mi
NCAR-Wyoming Supercomputing CenterUniversity Corporation for Atmospheric Research11.2 mi
Data center, CheyenneNot recorded14.8 mi
Data center, CheyenneNot recorded16.9 mi
Data center, CheyenneNot recorded17.1 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map