Silver Sage Windpower is a wind power plant in Wyoming with a nameplate capacity of 42.0 MW. It generates roughly 109.5k MWh per year — enough to power about 10,430 average U.S. homes.
Its capacity factor of 30% reflects intermittent or peaking operation.
Run flat out every hour of the year, Silver Sage Windpower could make 367.9k MWh. In 2023 it made 109.5k MWh — the same as running at full power 30 hours in every 100.
Peaking or variableCapacity factor 30%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 1425 Happy Jack Rd. |
|---|---|
| City | Cheyenne |
| County | Laramie County |
| State | Wyoming |
| ZIP | 82009 |
| Coordinates | 41.12968, -105.02400 |
| Operator | Deriva Energy |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| SSW01 | Onshore Wind Turbine | Wind | 42.0 MW | Operating | 2009 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | Western Area Power Administration UGP West |
Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.
| Data center | Distance |
|---|---|
| CYS42 Datacenter | 6.0 mi |
| Data center, Fe Warren Afb | 6.0 mi |
| Data center, Fe Warren Afb | 6.4 mi |
| CYS41 Datacenter | 6.5 mi |
| NCAR-Wyoming Supercomputing Center | 6.6 mi |
| Data center, Cheyenne | 11.0 mi |
| Data center, Cheyenne | 13.2 mi |
| Data center, Cheyenne | 13.5 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map