Digital Realty Silicon Valley SJC30

Digital Realty Silicon Valley SJC30 is a data center in Santa Clara, Santa Clara County, California. It is mapped as 1 building covering about 1.1 acres (48,000 sq ft). Its power comes off the California grid (California ISO), which runs on 43% natural gas, 20% solar and 14% hydroelectric.

OperatorDigital Realtyas mapped
Roof area1.1 ac1 building
Grid CO₂426 lbper MWh, CAMX region
Nearest plant0.2 miEQX011 Duane Fuel Cell

Location

This data centerOther data centersPower plants (colored by fuel)

Address3105 Alfred Street, Santa Clara CA 95054
CountySanta Clara County, California
Coordinates37.37832, -121.95828
Websitewww.digitalrealty.com/data-centers/americas/silicon-valley/…
On OpenStreetMapway/209073647

What powers Digital Realty Silicon Valley SJC30

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's California grid region, and the county's largest utility is on the California ISO grid. In 2023, the region's electricity was 43% natural gas, 20% solar, 14% hydroelectric and 8% nuclear.

Each megawatt-hour carried about 426 lb of CO₂, 44% cleaner than the U.S. grid as a whole (765 lb).

Natural Gas 43%Solar 20%Hydroelectric 14%Nuclear 8%Wind 7%Geothermal 4%Biomass 2%Coal 2%

Share of electricity generated in EPA's California grid region (CAMX) in 2023, from eGRID. 222 TWh from 1,674 plants.

Utilities that serve Santa Clara County

UtilityTypeGridBusiness rateIndustrial rate
Pacific Gas & Electric Co.Investor OwnedCalifornia ISO39.5¢33.1¢
City of Santa Clara - (CA)MunicipalCalifornia ISO22.1¢15.1¢
City of Palo Alto - (CA)MunicipalCalifornia ISO17.0¢19.0¢
WAPA-- Western Area Power AdministrationFederalWestern Area Power Administration - Desert Southwest Region4.6¢2.9¢

Utilities that report serving Santa Clara County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
EQX011 Duane Fuel CellNatural Gas5.2 MW0.2 mi
Donald Von Raesfeld Power PlantNatural Gas154 MW0.4 mi
Intel Santa ClaraNatural Gas1.1 MW0.5 mi
Mission College Blvd. Fuel CellNatural Gas5.0 MW0.6 mi
CoreSite Real Estate SV9, L.P.Oil31.5 MW0.6 mi
CoreSite Real Estate 2972 Stender, L.P.Oil12.0 MW0.7 mi
CoreSite Real Estate 3045 Stender, LPOil27.0 MW0.7 mi
CoreSite Real Estate 2901 Coronado, L.P.Oil10.0 MW0.8 mi
CoreSite Real Estate 3032 Coronado, L.P.Oil39.0 MW0.8 mi
SC 1 Data Center, Phase 2Oil99.6 MW1.4 mi

The largest power plant within 50 miles is Dynegy Moss Landing Power Plant Hybrid, a 1,848 MW natural gas plant 41 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
OpenColoOperator not recorded1.5 ac0.1 mi
Equinix Santa Clara SV2Equinix1.9 ac0.2 mi
Csquare SFO4Csquare1.4 ac0.2 mi
Digital Realty Silicon Valley SJC29Digital Realty0.9 ac0.2 mi
Santa Clara Data Center (SJC3)Evocative0.6 ac0.2 mi
Digital Realty Silicon Valley SJC16Digital Realty1.0 ac0.3 mi
Prime SANTA CLARA DATA CENTERPrime0.6 ac0.3 mi
ColovoreOperator not recorded0.6 ac0.3 mi
Digital Realty Silicon Valley SJC15Digital Realty0.6 ac0.3 mi
Digital Realty Silicon Valley SJC10Digital Realty1.3 ac0.3 mi
Lumen Santa ClaraLumen Technologies0.6 ac0.4 mi
Prime Santa ClaraPrime0.7 ac0.4 mi
LumenLumen Technologies0.8 ac0.4 mi
EdgeCore Silicon ValleyOperator not recorded1.8 ac0.5 mi
Digital Realty Silicon Valley SJC11Digital Realty1.0 ac0.5 mi

And 42 more within 5 miles.

More

Data centers in California · Data centers in Santa Clara County · All Digital Realty data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me