Power Plants Near 28768 — Pisgah Forest, NC
74 power plants within 50 miles of ZIP 28768 (Pisgah Forest, North Carolina). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 35.2599, -82.6695 · County: Transylvania
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 15.8 mi | Tuxedo Flat Rock, NC | Hydroelectric | 5 MW | Northbrook Tuxedo, Llc |
| 16.4 mi | Asheville Arden, NC | Natural Gas | 1,012 MW | Duke Energy Progress - (Nc) |
| 18.5 mi | Sawtell Solar Hendersonville, NC | Solar | 3 MW | Sawtell Solar, Llc |
| 18.9 mi | Enka Enka, NC | Coal | — | Basf Corporation |
| 19.1 mi | Tennessee Creek Tuckasegee, NC | Hydroelectric | 11 MW | Duke Energy Carolinas, Llc |
| 19.1 mi | Innovative Solar 14, Llc Hendersonville, NC | Solar | 2 MW | Aes Distributed Energy |
| 19.3 mi | Innovative Solar 10 Canton, NC | Solar | 2 MW | Cypress Creek Renewables |
| 19.4 mi | Innovative Solar 16 Hendersonville, NC | Solar | 2 MW | Cypress Creek Renewables |
| 21.2 mi | Asheville-Rock Hill Battery Asheville, NC | Other Fossil | 9 MW | Duke Energy Progress - (Nc) |
| 21.3 mi | Biltmore Solar Fields Asheville, NC | Solar | 2 MW | The Biltmore Company |
| 22.7 mi | Bear Creek Dam Tuckasegee, NC | Hydroelectric | 9 MW | Duke Energy Carolinas, Llc |
| 24.2 mi | Cedar Cliff Tuckasegee, NC | Hydroelectric | 6 MW | Duke Energy Carolinas, Llc |
| 25.0 mi | Jocassee Salem, SC | Hydroelectric | 774 MW | Duke Energy Carolinas, Llc |
| 25.4 mi | Bad Creek Salem, SC | Hydroelectric | 1,584 MW | Duke Energy Carolinas, Llc |
| 25.8 mi | Thorpe Tuckasegee, NC | Hydroelectric | 22 MW | Duke Energy Carolinas, Llc |
| 25.9 mi | Tuckasegee Tuckasegee, NC | Hydroelectric | 3 MW | Duke Energy Carolinas, Llc |
| 26.7 mi | Riverside Bess Asheville, NC | Battery Storage | — | Duke Energy Progress - (Nc) |
| 27.2 mi | Metropolitan Sewerage District Asheville, NC | Hydroelectric | 2 MW | Metropolitan Sewerage District |
| 27.6 mi | Innovative Solar 6 Leicester, NC | Solar | 4 MW | Cypress Creek Renewables |
| 27.7 mi | Woodfin Woodfin, NC | Natural Gas | — | Duke Energy Progress - (Nc) |
| 27.7 mi | Turner Shoals Mill Springs, NC | Hydroelectric | 5 MW | Northbrook Carolina Hydro Llc |
| 27.9 mi | Woodfin Solar Asheville, NC | Solar | 5 MW | Duke Energy Progress - (Nc) |
| 29.7 mi | Lake Lure Lake Lure, NC | Hydroelectric | 4 MW | Lake Lure Town Of |
| 30.1 mi | Saluda Dam Greenville, SC | Hydroelectric | 2 MW | Northbrook Carolina Hydro Llc |
| 30.7 mi | Marshall Dam Marshall, NC | Hydroelectric | 5 MW | Duke Energy Progress - (Nc) |
| 30.7 mi | Cornell Dubilier Liberty, SC | Oil | — | South Carolina Public Service Authority |
| 31.8 mi | Central Plant Greenville, SC | Oil | 4 MW | Bob Jones University |
| 34.2 mi | Keowee Seneca, SC | Hydroelectric | 158 MW | Duke Energy Carolinas, Llc |
| 34.7 mi | Oconee Seneca, SC | Nuclear | 2,667 MW | Duke Energy Carolinas, Llc |
| 34.8 mi | Ballenger Road Solar A Inman, SC | Solar | 2 MW | Ballenger Road Solar A |
| 35.3 mi | Wellford Renewable Energy Plant Spartanburg, SC | Biomass | 2 MW | Lockhart Power Co |
| 35.5 mi | Ivy River Hydro Marshall, NC | Hydroelectric | 1 MW | Madison Hydro Partners |
| 36.1 mi | White Horse Solar A Greenville, SC | Solar | 2 MW | White Horse Solar A |
| 36.9 mi | Walters Waterville, NC | Hydroelectric | 108 MW | Duke Energy Progress - (Nc) |
| 37.5 mi | Bmw Manufacturing Co Greer, SC | Biomass | 11 MW | Bmw Manufacturing Co Llc |
| 38.0 mi | Ace Solar Piedmont, SC | Solar | 1 MW | Altus Power America Management, Llc |
| 38.1 mi | Whitt Solar Piedmont, SC | Solar | 2 MW | Altus Power America Management, Llc |
| 39.7 mi | Franklin (Nc) Franklin, NC | Hydroelectric | 1 MW | Northbrook Carolina Hydro Ii, Llc |
| 39.8 mi | Adams Piedmont, SC | Solar | 2 MW | Adams Solar Sc, Llc |
| 39.9 mi | Atood Solar Iii Llc Spartanburg, SC | Solar | 2 MW | Atood Solar Iii Llc |
| 39.9 mi | Aga Tag Solar Iii Llc Spartanburg, SC | Solar | 2 MW | Aga Tag Solar Iii Llc |
| 40.3 mi | Piedmont Hydro Power Project Piedmont, SC | Hydroelectric | 1 MW | Central Rivers Power Us, Llc |
| 41.0 mi | Spartanburg Water System Chesnee, SC | Hydroelectric | 3 MW | Spartanburg Commissioners Pw |
| 41.1 mi | Duke Energy Chp At Clemson University Clemson, SC | Natural Gas | 13 MW | Duke Energy Carolinas, Llc |
| 41.3 mi | Central Energy Facility Clemson, SC | Natural Gas | 6 MW | Clemson University - Main Campus |
| 41.9 mi | Enoree Phase Ii Landfill Gas Recovery Greer, SC | Biomass | 3 MW | Enerdyne Power Systems Inc |
| 42.1 mi | Amethyst Solar Forest City, NC | Solar | 3 MW | Amethyst Solar Llc |
| 42.7 mi | Seneca City Of Seneca, SC | Oil | 10 MW | City Of Seneca - (Sc) |
| 42.7 mi | Pelzer Solar I Pelzer, SC | Solar | 1 MW | Altus Power America Management, Llc |
| 43.5 mi | Highway 9 Solar Spartanburg, SC | Solar | — | Jsd Flatwood Pv-1, Llc |
| 44.1 mi | Limelight Solar I, Llc Spartanburg, SC | Solar | 2 MW | Limelight Solar I, Llc |
| 44.3 mi | Limelight Solar Iii, Llc Spartanburg, SC | Solar | 4 MW | Limelight Solar Iii, Llc |
| 44.3 mi | Westminister Nc Rutherfordton, NC | Solar | — | Ecoplexus, Inc |
| 44.4 mi | Pelzer Upper Petzer, SC | Hydroelectric | 2 MW | Central Rivers Power Us, Llc |
| 44.5 mi | Hot Springs Energy Storage & Microgrid Hot Springs, NC | Solar | 6 MW | Duke Energy Progress - (Nc) |
| 44.5 mi | Davis Road Solar Spartanburg, SC | Solar | — | Jsd Flatwood Pv-1, Llc |
| 44.7 mi | Fairview Solar Spartanburg, SC | Solar | — | Jsd Flatwood Pv-1, Llc |
| 45.2 mi | Bryant Road Solar Spartanburg, SC | Solar | 2 MW | Jsd Flatwood Pv-1, Llc |
| 45.3 mi | Multitrade Rabun Gap, Llc Rabun Gap, GA | Biomass | 18 MW | Multitrade Rabun Gap Llc |
| 45.8 mi | Bluebird Solar Sc Llc Pendleton, SC | Solar | 3 MW | Bluebird Solar Llc |
| 46.2 mi | Pelzer Lower Williamston, SC | Hydroelectric | 3 MW | Central Rivers Power Us, Llc |
| 46.6 mi | Valenite Westminster, SC | Oil | 3 MW | Central Electric Power |
| 46.8 mi | Clear Solar I, Llc Forest City, NC | Solar | 4 MW | Clear Solar I, Llc |
| 47.0 mi | Berry Road Solar Pelzer, SC | Solar | 2 MW | Rpsc Solar 3, Llc |
| 47.3 mi | Rutherford Farm Forest City, NC | Solar | 75 MW | Southern Power Co |
| 47.3 mi | W S Lee Williamston, SC | Natural Gas | 955 MW | Duke Energy Carolinas, Llc |
| 47.6 mi | Bostic Delivery No 2 Bostic, NC | Oil | 1 MW | North Carolina Mun Power Agny #1 |
| 47.8 mi | Charlotte Solar Forest City, NC | Solar | 5 MW | Cypress Creek Renewables |
| 48.3 mi | Limelight Solar Ii Llc Spartanburg, SC | Solar | 2 MW | Limelight Solar Ii Llc |
| 48.4 mi | Old Caroleen Solar Farm Forest City, NC | Solar | 2 MW | Cypress Creek Renewables |
| 48.4 mi | Gamble Solar Bostic, NC | Solar | 3 MW | Oppidum Renewables Usa, Llc |
| 48.7 mi | Lincoln Solar, Llc (Nc) Bostic, NC | Solar | 5 MW | Cypress Creek Renewables |
| 48.8 mi | Anderson Regional Landfill Belton, SC | Biomass | 3 MW | South Carolina Public Service Authority |
| 50.0 mi | Innovative Solar 18, Llc Bostic, NC | Solar | 2 MW | Cypress Creek Renewables |
Power generation near this area
There are 74 power plants within 50 miles of Pisgah Forest, North Carolina (ZIP 28768), with a combined 7,577 MW of nameplate capacity. Solar is the most common fuel type in this area with 34 of the 74 nearby plants. The closest plant is Tuxedo at 15.8 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in North Carolina, visit the North Carolina state page.
← Search a different location · Printable proximity report →