Power Plants Near 28774 — Sapphire, NC
61 power plants within 50 miles of ZIP 28774 (Sapphire, North Carolina). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 35.0666, -83.0019 · County: Transylvania
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 4.1 mi | Bad Creek Salem, SC | Hydroelectric | 1,584 MW | Duke Energy Carolinas, Llc |
| 8.9 mi | Jocassee Salem, SC | Hydroelectric | 774 MW | Duke Energy Carolinas, Llc |
| 10.2 mi | Tennessee Creek Tuckasegee, NC | Hydroelectric | 11 MW | Duke Energy Carolinas, Llc |
| 12.8 mi | Bear Creek Dam Tuckasegee, NC | Hydroelectric | 9 MW | Duke Energy Carolinas, Llc |
| 13.5 mi | Thorpe Tuckasegee, NC | Hydroelectric | 22 MW | Duke Energy Carolinas, Llc |
| 14.0 mi | Cedar Cliff Tuckasegee, NC | Hydroelectric | 6 MW | Duke Energy Carolinas, Llc |
| 14.4 mi | Tuckasegee Tuckasegee, NC | Hydroelectric | 3 MW | Duke Energy Carolinas, Llc |
| 19.7 mi | Keowee Seneca, SC | Hydroelectric | 158 MW | Duke Energy Carolinas, Llc |
| 19.7 mi | Oconee Seneca, SC | Nuclear | 2,667 MW | Duke Energy Carolinas, Llc |
| 22.7 mi | Multitrade Rabun Gap, Llc Rabun Gap, GA | Biomass | 18 MW | Multitrade Rabun Gap Llc |
| 23.4 mi | Franklin (Nc) Franklin, NC | Hydroelectric | 1 MW | Northbrook Carolina Hydro Ii, Llc |
| 24.4 mi | Cornell Dubilier Liberty, SC | Oil | — | South Carolina Public Service Authority |
| 26.3 mi | Seneca City Of Seneca, SC | Oil | 10 MW | City Of Seneca - (Sc) |
| 28.3 mi | Central Energy Facility Clemson, SC | Natural Gas | 6 MW | Clemson University - Main Campus |
| 28.4 mi | Valenite Westminster, SC | Oil | 3 MW | Central Electric Power |
| 28.7 mi | Duke Energy Chp At Clemson University Clemson, SC | Natural Gas | 13 MW | Duke Energy Carolinas, Llc |
| 28.8 mi | Innovative Solar 10 Canton, NC | Solar | 2 MW | Cypress Creek Renewables |
| 31.4 mi | Terrora Tallulah Falls, GA | Hydroelectric | 16 MW | Georgia Power Co |
| 31.4 mi | Tugalo Tallulah Falls, GA | Hydroelectric | 45 MW | Georgia Power Co |
| 31.8 mi | Tallulah Falls Tallulah Falls, GA | Hydroelectric | 72 MW | Georgia Power Co |
| 32.8 mi | Yonah Toccoa, GA | Hydroelectric | 23 MW | Georgia Power Co |
| 32.9 mi | Saluda Dam Greenville, SC | Hydroelectric | 2 MW | Northbrook Carolina Hydro Llc |
| 35.6 mi | Nacoochee Lakemont, GA | Hydroelectric | 5 MW | Georgia Power Co |
| 35.6 mi | Bluebird Solar Sc Llc Pendleton, SC | Solar | 3 MW | Bluebird Solar Llc |
| 35.8 mi | Burton Dam Clayton, GA | Hydroelectric | 6 MW | Georgia Power Co |
| 35.9 mi | Ace Solar Piedmont, SC | Solar | 1 MW | Altus Power America Management, Llc |
| 36.1 mi | Whitt Solar Piedmont, SC | Solar | 2 MW | Altus Power America Management, Llc |
| 36.7 mi | Tuxedo Flat Rock, NC | Hydroelectric | 5 MW | Northbrook Tuxedo, Llc |
| 37.1 mi | Adams Piedmont, SC | Solar | 2 MW | Adams Solar Sc, Llc |
| 37.9 mi | Enka Enka, NC | Coal | — | Basf Corporation |
| 38.2 mi | Asheville Arden, NC | Natural Gas | 1,012 MW | Duke Energy Progress - (Nc) |
| 38.4 mi | Central Plant Greenville, SC | Oil | 4 MW | Bob Jones University |
| 39.3 mi | White Horse Solar A Greenville, SC | Solar | 2 MW | White Horse Solar A |
| 39.6 mi | Piedmont Hydro Power Project Piedmont, SC | Hydroelectric | 1 MW | Central Rivers Power Us, Llc |
| 40.0 mi | Pelzer Solar I Pelzer, SC | Solar | 1 MW | Altus Power America Management, Llc |
| 40.6 mi | Queens Creek Topton, NC | Hydroelectric | 1 MW | Duke Energy Carolinas, Llc |
| 40.6 mi | Nantahala Topton, NC | Hydroelectric | 43 MW | Duke Energy Carolinas, Llc |
| 41.4 mi | Biltmore Solar Fields Asheville, NC | Solar | 2 MW | The Biltmore Company |
| 41.4 mi | Sawtell Solar Hendersonville, NC | Solar | 3 MW | Sawtell Solar, Llc |
| 41.9 mi | Innovative Solar 14, Llc Hendersonville, NC | Solar | 2 MW | Aes Distributed Energy |
| 42.1 mi | Innovative Solar 16 Hendersonville, NC | Solar | 2 MW | Cypress Creek Renewables |
| 42.6 mi | Asheville-Rock Hill Battery Asheville, NC | Other Fossil | 9 MW | Duke Energy Progress - (Nc) |
| 42.7 mi | Pelzer Upper Petzer, SC | Hydroelectric | 2 MW | Central Rivers Power Us, Llc |
| 43.5 mi | Walters Waterville, NC | Hydroelectric | 108 MW | Duke Energy Progress - (Nc) |
| 43.5 mi | Franklin Milliken Lavonia, GA | Solar | 3 MW | Safari Energy, Llc |
| 43.7 mi | Anderson (Sc) Anderson, SC | Solar | 2 MW | Anderson Solar Farm, Llc |
| 44.0 mi | Innovative Solar 6 Leicester, NC | Solar | 4 MW | Cypress Creek Renewables |
| 44.2 mi | Pelzer Lower Williamston, SC | Hydroelectric | 3 MW | Central Rivers Power Us, Llc |
| 44.8 mi | Chatuge Hayesville, NC | Hydroelectric | 13 MW | Tennessee Valley Authority |
| 45.4 mi | W S Lee Williamston, SC | Natural Gas | 955 MW | Duke Energy Carolinas, Llc |
| 45.8 mi | Anderson Regional Landfill Belton, SC | Biomass | 3 MW | South Carolina Public Service Authority |
| 45.9 mi | Riverside Bess Asheville, NC | Battery Storage | — | Duke Energy Progress - (Nc) |
| 46.2 mi | Metropolitan Sewerage District Asheville, NC | Hydroelectric | 2 MW | Metropolitan Sewerage District |
| 46.9 mi | Woodfin Solar Asheville, NC | Solar | 5 MW | Duke Energy Progress - (Nc) |
| 46.9 mi | Marshall Dam Marshall, NC | Hydroelectric | 5 MW | Duke Energy Progress - (Nc) |
| 47.5 mi | Woodfin Woodfin, NC | Natural Gas | — | Duke Energy Progress - (Nc) |
| 48.1 mi | Bmw Manufacturing Co Greer, SC | Biomass | 11 MW | Bmw Manufacturing Co Llc |
| 48.3 mi | Berry Road Solar Pelzer, SC | Solar | 2 MW | Rpsc Solar 3, Llc |
| 49.5 mi | Wellford Renewable Energy Plant Spartanburg, SC | Biomass | 2 MW | Lockhart Power Co |
| 49.6 mi | Turner Shoals Mill Springs, NC | Hydroelectric | 5 MW | Northbrook Carolina Hydro Llc |
| 49.8 mi | Enoree Phase Ii Landfill Gas Recovery Greer, SC | Biomass | 3 MW | Enerdyne Power Systems Inc |
Power generation near this area
There are 61 power plants within 50 miles of Sapphire, North Carolina (ZIP 28774), with a combined 7,677 MW of nameplate capacity. Hydroelectric is the most common fuel type in this area with 27 of the 61 nearby plants. The closest plant is Bad Creek at 4.1 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in North Carolina, visit the North Carolina state page.
← Search a different location · Printable proximity report →