Power Plants Near 93286 — Woodlake, CA
100 power plants within 50 miles of ZIP 93286 (Woodlake, California). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 36.4313, -119.0918 · County: Tulare
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 4.8 mi | Terminus Hydroelectric Project Lemon Cove, CA | Hydroelectric | 20 MW | Eagle Creek Renewable Energy, Llc |
| 9.6 mi | Ivanhoe Solar Visalia, CA | Solar | 4 MW | Altus Power America Management, Llc |
| 11.5 mi | Exeter Solar Exeter, CA | Solar | 4 MW | Altus Power America Management, Llc |
| 11.6 mi | Visalia - (Ca) Visalia, CA | Solar | 5 MW | Pacifico Power |
| 11.9 mi | Visalia Csg Llc Tulare, CA | Solar | 3 MW | Dimension Energy Llc |
| 12.0 mi | Kaweah 2 Three Rivers, CA | Hydroelectric | 2 MW | Southern California Edison Co |
| 12.3 mi | Bob Wiley Detention Center Visalia, CA | Solar | 2 MW | Socore Energy Llc |
| 12.8 mi | North Juvenile Detention Center Solar Visalia, CA | Solar | 1 MW | Socore Energy Llc |
| 13.0 mi | Kaweah 1 Three Rivers, CA | Hydroelectric | 2 MW | Southern California Edison Co |
| 13.4 mi | Kaweah Delta District Hospital Visalia, CA | Natural Gas | 4 MW | Kaweah Delta Hospital |
| 14.3 mi | Civic Center East Visalia, CA | Solar | 2 MW | Socore Energy Llc |
| 14.4 mi | Elkhorn Dairy Visalia, CA | Solar | 1 MW | Bravo Rec Management Llc |
| 14.7 mi | Pom Juice Solar Fresno, CA | Solar | 2 MW | Wonderful Renewable Energy, Llc. |
| 14.7 mi | Kaweah 3 Three Rivers, CA | Hydroelectric | 5 MW | Southern California Edison Co |
| 15.1 mi | Pom Beverage Solar Del Rey, CA | Solar | 2 MW | Wonderful Renewable Energy, Llc. |
| 15.3 mi | Lindsay Solar Lindsay, CA | Solar | 4 MW | Altus Power America Management, Llc |
| 16.3 mi | Tulare Akers Professional Center Visalia, CA | Solar | 1 MW | Socore Energy Llc |
| 16.4 mi | Government Plaza Solar Visalia, CA | Solar | 1 MW | Socore Energy Llc |
| 16.6 mi | Shirk Energy Storage Visalia, CA | Battery Storage | — | Vesi 15 Llc |
| 16.7 mi | Farmersville Farmersville, CA | Solar | 5 MW | Arevon Energy, Inc. |
| 17.1 mi | Mm Tulare Energy Visalia, CA | Biomass | 2 MW | Mm Tulare Energy Llc |
| 17.4 mi | Visalia Solar Visalia, CA | Solar | 4 MW | United Parcel Service |
| 17.9 mi | Pivot Energy Ppa 22 Visalia, CA | Solar | 1 MW | Pivot Energy |
| 18.0 mi | Re-Vfo Llc Visalia, CA | Solar | 1 MW | Re-Vfo Llc |
| 19.2 mi | Double J Dairy Array Visalia, CA | Solar | 4 MW | Bravo Rec Management Llc |
| 20.0 mi | Dinuba Wastewater Treatment Plant Dinuba, CA | Solar | 1 MW | Aes Distributed Energy |
| 20.4 mi | Ftf-Packingshed Reedley, CA | Solar | 1 MW | Family Tree Farms |
| 20.6 mi | Dinuba Energy Reedley, CA | Biomass | 12 MW | Dinuba Energy |
| 21.3 mi | Agriculture Capital - Legacy Packing Dinuba, CA | Solar | 2 MW | Distributed Solar Development, Llc |
| 22.9 mi | Porterville Solar Porterville, CA | Solar | 4 MW | Altus Power America Management, Llc |
| 23.1 mi | Tulare Biomat Fuel Cell Tulare, CA | Biomass | 3 MW | Central Ca Fuel Cell 2, Llc |
| 23.2 mi | City Of Tulare Water Facility Tulare, CA | Solar | 9 MW | City Of Tulare Water Pollution Control |
| 23.3 mi | Central Ca Fuel Cell 1 Tulare, CA | Natural Gas | 3 MW | Central Ca Fuel Cell 1 |
| 23.6 mi | Moonlight Packing - Phase 2 Reedley, CA | Solar | 1 MW | Calcom Energy |
| 23.6 mi | Reedley Community College Solar Reedley, CA | Solar | 3 MW | Forefront Power, Llc |
| 23.9 mi | Anode (Springville) Bess Big Creek, CA | Battery Storage | — | Southern California Edison Co |
| 24.2 mi | Still Water Power Hanford, CA | Biomass | 1 MW | Still Water Power Llc |
| 24.3 mi | Tulare 1 And 2 Tulare, CA | Solar | 3 MW | Arevon Energy, Inc. |
| 24.4 mi | 2081 Terzian Solar Project Reedley, CA | Solar | 1 MW | Solarenewal Llc |
| 24.5 mi | Dixie Creek Dairy Solar Hanford, CA | Solar | 3 MW | Bravo Rec Management Llc |
| 24.6 mi | Radial O'neil Tracker 1 Coalinga, CA | Solar | — | Radial O'neil Tracker 1, Llc |
| 25.4 mi | Kingsburg Solar Kingsburg, CA | Solar | 4 MW | Altus Power America Management, Llc |
| 25.7 mi | Dover Dairy Hanford, CA | Solar | 1 MW | Renewable Solar, Inc |
| 26.2 mi | Lone Oak Hanford, CA | Solar | 3 MW | Bravo Rec Management Llc |
| 26.5 mi | Lower Tule River Springdale, CA | Hydroelectric | 3 MW | Southern California Edison Co |
| 26.6 mi | Porterville 6 And 7 Porterville, CA | Solar | 3 MW | Arevon Energy, Inc. |
| 27.2 mi | South County Detention Center Solar Porterville, CA | Solar | 1 MW | Socore Energy Llc |
| 27.4 mi | Tulare Success Power Project Porterville, CA | Hydroelectric | 1 MW | Lower Tule River Irrgtn Dist |
| 27.9 mi | Solar Photovoltaic Project #42 Tulare, CA | Solar | 5 MW | Southern California Edison Co |
| 28.1 mi | Kingsburg Cogen Kingsburg, CA | Natural Gas | 36 MW | Kes Kingsburg Lp |
| 28.3 mi | Tule River Springville, CA | Hydroelectric | 8 MW | Tule Hydro Llc |
| 29.1 mi | Twc Tulare, CA | Solar | 1 MW | Bravo Rec Management Llc |
| 29.1 mi | Tipton 1 - (Ca) Tipton, CA | Solar | 5 MW | Pacifico Power |
| 29.1 mi | Tipton 2 - (Ca) Tipton, CA | Solar | 3 MW | Pacifico Power |
| 30.1 mi | River Ranch Dairy Hanford, CA | Solar | 4 MW | Renewable Solar, Inc |
| 30.1 mi | Kings River Syphon Sanger, CA | Hydroelectric | 1 MW | Orange Cove Irrigation District |
| 30.6 mi | Pine Flat Piedra, CA | Hydroelectric | 165 MW | Kings River Conservation Dist |
| 31.0 mi | Algonquin Power Sanger Llc Sanger, CA | Natural Gas | 62 MW | Algonquin Power Sanger Llc |
| 31.1 mi | Hanford 1 And 2 Hanford, CA | Solar | 3 MW | Arevon Energy, Inc. |
| 31.5 mi | Canal Energy S23, Llc Hanford, CA | Solar | 4 MW | Canal Energy S23, Llc |
| 31.5 mi | Pom Plant 1 Del Rey, CA | Solar | 2 MW | Wonderful Renewable Energy, Llc. |
| 31.8 mi | Kings River Ph Balch Camp, CA | Hydroelectric | 49 MW | Pacific Gas & Electric Co. |
| 31.8 mi | Pom Plant 2 Del Rey, CA | Solar | 2 MW | Wonderful Renewable Energy, Llc. |
| 32.1 mi | Danell Bros Inc Hanford, CA | Solar | 3 MW | Renewable Solar, Inc |
| 32.7 mi | Blue Moon Farms Tipton, CA | Solar | 1 MW | Bravo Rec Management Llc |
| 32.9 mi | Hanford Energy Park Peaker Hanford, CA | Natural Gas | 92 MW | Mrp San Joaquin Energy Llc. |
| 32.9 mi | Cottonwood Solar, Llc (City Of Corcoran) Corcoran, CA | Solar | 12 MW | Onward Energy |
| 32.9 mi | Lead Bess 1 Hanford, CA | Battery Storage | — | Hanford Bess Llc |
| 32.9 mi | Lead Bess 2 Hanford, CA | Battery Storage | — | Hanford Bess Llc |
| 33.0 mi | Balch 2 Balch Camp, CA | Hydroelectric | 97 MW | Pacific Gas & Electric Co. |
| 33.0 mi | Balch 1 Balch Camp, CA | Hydroelectric | 31 MW | Pacific Gas & Electric Co. |
| 33.2 mi | Corcoran Irrigation District Floating So Corcoran, CA | Solar | — | Solar Powered Ag, Llc |
| 33.2 mi | Cid Solar (Ca) Corcoran, CA | Solar | 2 MW | Dg California Solar Llc |
| 33.2 mi | Cid Solar, Llc Corcoran, CA | Solar | 20 MW | Onward Energy |
| 33.6 mi | Corcoran Solar Corcoran, CA | Solar | 20 MW | Consolidated Edison Development Inc. |
| 33.7 mi | Corcoran Solar 3 Corcoran, CA | Solar | 20 MW | Consolidated Edison Development Inc. |
| 33.8 mi | Corcoran Solar 2 Corcoran, CA | Solar | 20 MW | Consolidated Edison Development Inc. |
| 34.5 mi | Haas Balch Camp, CA | Hydroelectric | 135 MW | Pacific Gas & Electric Co. |
| 34.9 mi | Corcoran Corcoran, CA | Solar | 1 MW | Terraform Arcadia |
| 34.9 mi | National Raisin Fowler, CA | Solar | 3 MW | National Raisin |
| 35.9 mi | Case Vander Eyk, Jr Dairy Solar Pixley, CA | Solar | 1 MW | Bravo Rec Management Llc |
| 36.2 mi | Guernsey Solar Station Hanford, CA | Solar | 20 MW | Pacific Gas & Electric Co. |
| 36.2 mi | Cdcr (Ca) - Corcoran State Prison Corcoran, CA | Solar | 5 MW | Sune Corcoran Sp Owner, Llc |
| 37.0 mi | Verwey-Hanford Dairy Digester #1 Hanford, CA | Biomass | 1 MW | Alsoenergy |
| 37.0 mi | Verwey-Hanford Dairy Digester #2 Hanford, CA | Biomass | 1 MW | Hanford Renewable Energy Llc |
| 37.0 mi | Verwey-Hanford Dairy Digester #3 Hanford, CA | Biomass | 1 MW | Hanford Renewable Energy Llc |
| 37.2 mi | Rexford 2 Solar Farm Ducor, CA | Battery Storage | — | 22sv 8me Llc |
| 37.4 mi | Zonneveld Oak Grove Laton, CA | Solar | 2 MW | Renewable Solar, Inc |
| 37.6 mi | Tulare Csg Llc Tulare, CA | Solar | 3 MW | Dimension Energy Llc |
| 38.0 mi | Ca - Fresno, City Of - Se Surface Wtp Fresno, CA | Solar | — | Forefront Power, Llc |
| 38.5 mi | White River Solar 2 Alpaugh, CA | Solar | 20 MW | Consolidated Edison Development Inc. |
| 38.6 mi | Ca - Fresno County - Juvenile Hall Fresno, CA | Solar | 3 MW | Forefront Power, Llc |
| 39.2 mi | Vitro Flat Glass Llc Fresno, CA | Oil | 3 MW | Vitro Flat Glass Llc |
| 39.3 mi | Rio Bravo Fresno Fresno, CA | Biomass | 28 MW | Rio Bravo Fresno |
| 39.7 mi | Clovis East High School Clovis, CA | Solar | 1 MW | Tesla Inc. |
| 39.8 mi | Ced Ducor 1 Ducor, CA | Solar | 20 MW | Consolidated Edison Development Inc. |
| 40.2 mi | Malaga Power Llc Fresno, CA | Natural Gas | 121 MW | Calpeak Power, Llc |
| 40.2 mi | Acid Bess Fresno, CA | Battery Storage | 97 MW | Malaga Bess Llc |
| 40.3 mi | Ced Ducor 4 Ducor, CA | Solar | 20 MW | Consolidated Edison Development Inc. |
| 40.5 mi | Ced Ducor 3 Ducor, CA | Solar | 15 MW | Consolidated Edison Development Inc. |
Power generation near this area
There are 100 power plants within 50 miles of Woodlake, California (ZIP 93286), with a combined 1,309 MW of nameplate capacity. Solar is the most common fuel type in this area with 66 of the 100 nearby plants. The closest plant is Terminus Hydroelectric Project at 4.8 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in California, visit the California state page.
← Search a different location · Printable proximity report →