Euclid Farm, Stamco N-54 is a wind power plant in Ohio with a nameplate capacity of 1.0 MW. It generates roughly 560 MWh per year — enough to power about 53 average U.S. homes.
Its capacity factor of 6% reflects intermittent or peaking operation.
Run flat out every hour of the year, Euclid Farm, Stamco N-54 could make 8.8k MWh. In 2023 it made 560 MWh — the same as running at full power 6 hours in every 100.
Peaking or variableCapacity factor 6%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 26650 Lakeland Blvd |
|---|---|
| City | Euclid |
| County | Cuyahoga County |
| State | Ohio |
| ZIP | 44106 |
| Coordinates | 41.60222, -81.49694 |
| Operator | Case Western Reserve University |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| N-54 | Onshore Wind Turbine | Wind | 1.0 MW | Operating | 2012 |
| NERC Region | RFC |
|---|---|
| Balancing Authority | PJM Interconnection, LLC |
Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.
| Data center | Distance |
|---|---|
| Lumen Cleveland | 10.7 mi |
| H5 Data Center | 11.7 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map