Electric generating plantEIA plant no. 59024

Euclid Farm, Stamco N-54

Type
Onshore Wind Turbine
Nameplate capacity
1.0 MW
Units
1
In service since
2012
Operator
Case Western Reserve University
Location
Euclid, Cuyahoga County, Ohio
Rated 213th largest in Ohio · 13806th of 14,761 in the U.S. · by nameplate

Euclid Farm, Stamco N-54 is a wind power plant in Ohio with a nameplate capacity of 1.0 MW. It generates roughly 560 MWh per year — enough to power about 53 average U.S. homes.

Its capacity factor of 6% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Euclid Farm, Stamco N-54 could make 8.8k MWh. In 2023 it made 560 MWh — the same as running at full power 6 hours in every 100.

Nameplate, full year8.8k MWh1.0 MW × 8,760 hours
Actually generated560 MWhEPA eGRID, 2023 · ≈53 homes

Peaking or variableCapacity factor 6%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

NuclearNatural GasCoalOilWindSolarBiomassBattery Storage

Location

Address26650 Lakeland Blvd
CityEuclid
CountyCuyahoga County
StateOhio
ZIP44106
Coordinates41.60222, -81.49694
OperatorCase Western Reserve University

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
N-54Onshore Wind TurbineWind1.0 MWOperating2012

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Cuyahoga County

View all plants in Cuyahoga County →

Data centers near Euclid Farm, Stamco N-54

Data centerOperatorDistance
Lumen ClevelandNot recorded10.7 mi
H5 Data CenterH511.7 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more