Power Plants Near 95306 — Catheys Valley, CA
90 power plants within 50 miles of ZIP 95306 (Catheys Valley, California). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 37.4404, -120.1438 · County: Mariposa
| Distance | Plant | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| 10.7 mi | McSwain Snelling, CA | Hydroelectric | 9 MW | Merced Irrigation District |
| 11.7 mi | Merced Falls Snelling, CA | Hydroelectric | 3 MW | Merced Irrigation District |
| 12.1 mi | Exchequer Snelling, CA | Hydroelectric | 95 MW | Merced Irrigation District |
| 16.6 mi | Broadway 3 - UC Merced 1 Merced, CA | Solar | 1 MW | MN8 Energy LLC |
| 16.7 mi | UC Merced Solar Hybrid Merced, CA | Solar | 5 MW | MN8 Energy LLC |
| 16.7 mi | Parker Snelling, CA | Hydroelectric | 3 MW | Merced Irrigation District |
| 20.8 mi | 2097 Helton Solar Project Merced, CA | Solar | 2 MW | Solarenewal LLC |
| 21.8 mi | Avenue 26 Solar Chowchilla, CA | Solar | 8 MW | RPCA Solar 1, LLC |
| 22.1 mi | Mission Solar LLC Merced, CA | Solar | 2 MW | Ecos Energy LLC |
| 22.2 mi | Merced Solar LLC Merced, CA | Solar | 2 MW | Ecos Energy LLC |
| 22.8 mi | La Grange La Grange, CA | Hydroelectric | 5 MW | Turlock Irrigation District |
| 23.1 mi | Upper Dawson La Grange, CA | Hydroelectric | 4 MW | Turlock Irrigation District |
| 23.3 mi | Don Pedro La Grange, CA | Hydroelectric | 171 MW | Turlock Irrigation District |
| 23.4 mi | DGS Valley State Prison Chowchilla, CA | Solar | 2 MW | Forefront Power, LLC |
| 23.6 mi | Five H Farms Solar Array Merced, CA | Solar | 1 MW | Maas Energy Works |
| 23.7 mi | Chowchilla II Chowchilla, CA | Natural Gas | 50 MW | California Power Holdings LLC |
| 23.8 mi | Ampersand Chowchilla Biomass LLC Chowchilla, CA | Biomass | 13 MW | Ampersand Chowchilla Biomass LLC |
| 24.2 mi | DGS Central California Womens Facility Chowchilla, CA | Solar | 2 MW | Forefront Power, LLC |
| 24.2 mi | Adera Solar Chowchilla, CA | Solar | 20 MW | AES Distributed Energy |
| 25.3 mi | Merced Pipeline Merced, CA | Solar | 4 MW | Maas Energy Works |
| 25.9 mi | El Nido Facility El Nido, CA | Biomass | 13 MW | Merced Power LLC |
| 26.6 mi | Madera 1 PV Madera, CA | Solar | 2 MW | ZGlobal Inc |
| 26.9 mi | Moccasin Moccasin, CA | Hydroelectric | 104 MW | City & County of San Francisco - (CA) |
| 27.4 mi | Turlock Lake Hickman, CA | Hydroelectric | 3 MW | Turlock Irrigation District |
| 27.6 mi | Moccasin Low Head Hydro Project Moccasin, CA | Hydroelectric | 3 MW | City & County of San Francisco - (CA) |
| 27.8 mi | East Cleveland Road Solar El Nido, CA | Solar | 3 MW | RPCA Solar 7, LLC |
| 29.0 mi | City of Atwater NEM Atwater, CA | Solar | 2 MW | SoCore Energy LLC |
| 29.7 mi | Site 980 65 Madera, CA | Hydroelectric | 2 MW | Madera-Chowchilla Power Auth |
| 31.9 mi | Diamond H Dairy Power Chowchilla, CA | Biomass | 2 MW | Madera DP 2, LLC |
| 32.0 mi | R C Kirkwood Groveland, CA | Hydroelectric | 133 MW | City & County of San Francisco - (CA) |
| 32.1 mi | West Tambo Clean Power II Livingston, CA | Solar | 2 MW | West Tambo Clean Power II |
| 32.4 mi | Costa View Farms Madera, CA | Solar | 5 MW | 127 Cvf, LLC |
| 33.0 mi | Dion R Holm Groveland, CA | Hydroelectric | 180 MW | City & County of San Francisco - (CA) |
| 34.3 mi | CA - Madera USD - Madera South HS Madera, CA | Solar | 1 MW | Forefront Power, LLC |
| 34.5 mi | City of Madera WWTP Madera, CA | Solar | 1 MW | SunE GIL1, LLC |
| 34.5 mi | Sealed Air Madera Solar Project Madera, CA | Solar | 4 MW | Sealed Air Corporation |
| 34.9 mi | Madera Community Hospital Madera, CA | Solar | 1 MW | CleanCapital Holdings |
| 35.0 mi | Sierra Pacific Chinese Camp Chinese Camp, CA | Solar | 4 MW | Sierra Pacific Industries |
| 35.1 mi | Pacific-Ultrapower Chinese Station Jamestown, CA | Biomass | 25 MW | IHI Power Services Corp |
| 35.1 mi | Sierra Energy Storage, LLC Jamestown, CA | Battery Storage | 10 MW | Engie North America |
| 35.3 mi | Hickman Hickman, CA | Hydroelectric | 1 MW | Turlock Irrigation District |
| 35.6 mi | KDC Solar Madera LLC Madera, CA | Solar | 10 MW | TRITEC Americas |
| 36.0 mi | Borden Solar Farm Madera, CA | Solar | 50 MW | 41MB 8me, LLC |
| 36.5 mi | Dos Palos Cooperative Gin Dos Palos, CA | Solar | 1 MW | A2B Development LLC dba Mars Energy Development |
| 36.6 mi | San Joaquin 3 North Fork, CA | Hydroelectric | 4 MW | Pacific Gas & Electric Co. |
| 37.4 mi | Pacific Ethanol Madera Solar Array Madera, CA | Solar | 4 MW | Seaboard Energy California, LLC |
| 37.5 mi | Sonora 1 Jamestown, CA | Solar | 2 MW | CleanCapital Holdings |
| 37.6 mi | Sierra Pacific Sonora Standard, CA | Biomass | 8 MW | Sierra Pacific Industries |
| 38.0 mi | Henry Miller RD Dos Palos, CA | Solar | 2 MW | Henry Miller Reclamation District |
| 38.5 mi | Sun Harvest Solar NDP1 Dos Palos, CA | Solar | 2 MW | Altus Power America Management, LLC |
| 39.0 mi | Friant Hydro Facility Friant, CA | Hydroelectric | 38 MW | Friant Power Authority |
| 39.1 mi | San Joaquin 2 North Fork, CA | Hydroelectric | 3 MW | Pacific Gas & Electric Co. |
| 39.3 mi | Tulloch Jamestown, CA | Hydroelectric | 30 MW | Oakdale&South San Joaquin Irrigation D. |
| 40.4 mi | A G Wishon North Fork, CA | Hydroelectric | 13 MW | Pacific Gas & Electric Co. |
| 40.4 mi | Kerckhoff Auberry, CA | Hydroelectric | 23 MW | Pacific Gas & Electric Co. |
| 40.7 mi | Dos Palos Clean Power Dos Palos, CA | Solar | 3 MW | Dos Palos Clean Power LLC |
| 40.8 mi | New Melones Jamestown, CA | Hydroelectric | 300 MW | U S Bureau of Reclamation |
| 41.1 mi | Kerckhoff 2 Auberry, CA | Hydroelectric | 140 MW | Pacific Gas & Electric Co. |
| 41.4 mi | Walnut Energy Center Turlock, CA | Natural Gas | 301 MW | Turlock Irrigation District |
| 41.5 mi | Big Creek 4 North Fork, CA | Hydroelectric | 100 MW | Southern California Edison Co |
| 41.8 mi | Merced 2 BESS Dos Palos, CA | Battery Storage | 2 MW | ZGlobal Inc |
| 41.9 mi | Walnut Turlock, CA | Natural Gas | 50 MW | Turlock Irrigation District |
| 42.1 mi | Phoenix Sonora, CA | Hydroelectric | 2 MW | Pacific Gas & Electric Co. |
| 42.9 mi | Wonderful Firebaugh Firebaugh, CA | Solar | 5 MW | Wonderful Renewable Energy, LLC. |
| 43.6 mi | Wonderful Orchards - New Columbia Firebaugh, CA | Solar | 5 MW | Wonderful Renewable Energy, LLC. |
| 44.1 mi | Clovis North High School Fresno, CA | Solar | 1 MW | Tesla Inc. |
| 44.5 mi | SCCCD - Clovis Community College Fresno, CA | Solar | 1 MW | Forefront Power, LLC |
| 45.1 mi | McClure Modesto, CA | Natural Gas | 142 MW | Modesto Irrigation District |
| 45.2 mi | Frankenheimer Power Plant Oakdale, CA | Hydroelectric | 5 MW | Turlock Irrigation District |
| 45.6 mi | Godinho Dairy Digester Los Banos, CA | Biomass | 2 MW | Aligned Digesters Co., LLC |
| 45.6 mi | Central Valley Ag Power Oakdale, CA | Biomass | 2 MW | Central Valley Ag Power LLC |
| 46.2 mi | Big Creek 3 Auberry, CA | Hydroelectric | 175 MW | Southern California Edison Co |
| 46.7 mi | Fresno Bullard High School Hybrid Fresno, CA | Solar | 2 MW | Forefront Power, LLC |
| 46.7 mi | Saint Agnes Medical Center Fresno, CA | Natural Gas | 7 MW | Saint Agnes Medical Center |
| 46.8 mi | Mammoth Pool North Fork, CA | Hydroelectric | 190 MW | Southern California Edison Co |
| 47.0 mi | Almond Power Plant Modesto, CA | Natural Gas | 224 MW | Turlock Irrigation District |
| 47.2 mi | Althea Avenue Solar Firebaugh, CA | Solar | 5 MW | RPCA Solar 8, LLC |
| 47.5 mi | Big Creek 8 Auberry, CA | Hydroelectric | 75 MW | Southern California Edison Co |
| 47.7 mi | Fresno Hoover High School Hybrid Fresno, CA | Solar | 1 MW | Forefront Power, LLC |
| 48.5 mi | Oro Loma Oro Loma, CA | Solar | 20 MW | RWE Clean Energy |
| 48.7 mi | Angels Angels Camp, CA | Hydroelectric | 1 MW | Utica Water & Power Authority |
| 48.7 mi | CalRenew-1 Mendota, CA | Solar | 5 MW | CalRenew-1 LLC |
| 48.8 mi | OWC Energy Holdings, LLC Firebaugh, CA | Solar | 2 MW | Headwater Energy, LLC |
| 48.8 mi | Covanta Mendota Mendota, CA | Biomass | 28 MW | Clean Energy Systems Mendota |
| 48.9 mi | ERock MID Claribel Generation Station Modesto, CA | Natural Gas | 48 MW | Enchanted Rock |
| 48.9 mi | CSU Fresno Solar Project Fresno, CA | Solar | 1 MW | MMA Fresno Power LP |
| 48.9 mi | Big Creek 2 Auberry, CA | Hydroelectric | 67 MW | Southern California Edison Co |
| 48.9 mi | Big Creek 2A Auberry, CA | Hydroelectric | 110 MW | Southern California Edison Co |
| 49.6 mi | Woodward Power Plant Oakdale, CA | Hydroelectric | 3 MW | Turlock Irrigation District |
| 49.8 mi | Stanislaus Vallecito, CA | Hydroelectric | 82 MW | Pacific Gas & Electric Co. |
Power generation near this area
There are 90 power plants within 50 miles of Catheys Valley, California (ZIP 95306), with a combined 3,190 MW of nameplate capacity. Solar is the most common fuel type in this area with 40 of the 90 nearby plants. The closest plant is McSwain at 10.7 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in California, visit the California state page.
← Search a different location · Printable proximity report →