Power Plants Near 93653 — Raymond, CA
100 power plants within 50 miles of ZIP 93653 (Raymond, California). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 37.2790, -119.8766 · County: Madera
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 15.4 mi | Site 980 65 Madera, CA | Hydroelectric | 2 MW | Madera-Chowchilla Power Auth |
| 19.6 mi | Dgs Valley State Prison Chowchilla, CA | Solar | 2 MW | Forefront Power, Llc |
| 19.7 mi | Avenue 26 Solar Chowchilla, CA | Solar | 8 MW | Rpca Solar 1, Llc |
| 19.7 mi | San Joaquin 3 North Fork, CA | Hydroelectric | 4 MW | Pacific Gas & Electric Co. |
| 19.9 mi | Dgs Central California Womens Facility Chowchilla, CA | Solar | 2 MW | Forefront Power, Llc |
| 20.6 mi | Radial Harris Ag 1 Coalinga, CA | Solar | — | Radial Harris Ag 1 Llc |
| 21.3 mi | North Fork Community Power North Fork, CA | Biomass | — | Phoenix Energy |
| 21.5 mi | San Joaquin 2 North Fork, CA | Hydroelectric | 3 MW | Pacific Gas & Electric Co. |
| 21.7 mi | Friant Hydro Facility Friant, CA | Hydroelectric | 38 MW | Friant Power Authority |
| 22.0 mi | Kerckhoff Auberry, CA | Hydroelectric | 23 MW | Pacific Gas & Electric Co. |
| 22.2 mi | Madera 1 Pv Madera, CA | Solar | 2 MW | Zglobal Inc |
| 22.3 mi | A G Wishon North Fork, CA | Hydroelectric | 13 MW | Pacific Gas & Electric Co. |
| 22.6 mi | Kerckhoff 2 Auberry, CA | Hydroelectric | 140 MW | Pacific Gas & Electric Co. |
| 23.4 mi | Big Creek 4 North Fork, CA | Hydroelectric | 100 MW | Southern California Edison Co |
| 23.7 mi | Chowchilla Ii Chowchilla, CA | Natural Gas | 50 MW | California Power Holdings Llc |
| 23.7 mi | Ampersand Chowchilla Biomass Llc Chowchilla, CA | Biomass | 13 MW | Ampersand Chowchilla Biomass Llc |
| 23.8 mi | Radial Harris Ag 3 Coalinga, CA | Solar | — | Radial Harris Ag 3, Llc |
| 23.8 mi | Borden Solar Farm Madera, CA | Solar | 50 MW | 41mb 8me, Llc |
| 24.7 mi | Ca - Madera Usd - Madera South Hs Madera, CA | Solar | 1 MW | Forefront Power, Llc |
| 25.1 mi | Sealed Air Madera Solar Project Madera, CA | Solar | 4 MW | Sealed Air Corporation |
| 25.2 mi | Madera Community Hospital Madera, CA | Solar | 1 MW | Cleancapital Holdings |
| 25.4 mi | Five H Farms Solar Array Merced, CA | Solar | 1 MW | Maas Energy Works |
| 25.4 mi | Kingston Energy Storage, Llc Madera, CA | Battery Storage | — | Enel Green Power Na, Inc. |
| 25.6 mi | Pacific Ethanol Madera Solar Array Madera, CA | Solar | 4 MW | Seaboard Energy California, Llc |
| 27.0 mi | Adera Solar Chowchilla, CA | Solar | 20 MW | Aes Distributed Energy |
| 27.4 mi | Kdc Solar Madera Llc Madera, CA | Solar | 10 MW | Valta Energy |
| 27.8 mi | Ardagh Solar Madera, CA | Solar | — | Kdc Solar Madera, Llc |
| 28.0 mi | Clovis North High School Fresno, CA | Solar | 1 MW | Tesla Inc. |
| 28.0 mi | City Of Madera Wwtp Madera, CA | Solar | 1 MW | Sune Gil1, Llc |
| 28.3 mi | Scccd - Clovis Community College Fresno, CA | Solar | 1 MW | Forefront Power, Llc |
| 28.4 mi | Big Creek 3 Auberry, CA | Hydroelectric | 175 MW | Southern California Edison Co |
| 29.1 mi | Mcswain Snelling, CA | Hydroelectric | 9 MW | Merced Irrigation District |
| 29.9 mi | Mammoth Pool North Fork, CA | Hydroelectric | 190 MW | Southern California Edison Co |
| 30.1 mi | Merced Falls Snelling, CA | Hydroelectric | 3 MW | Merced Irrigation District |
| 30.1 mi | Exchequer Snelling, CA | Hydroelectric | 95 MW | Merced Irrigation District |
| 30.5 mi | Big Creek 8 Auberry, CA | Hydroelectric | 75 MW | Southern California Edison Co |
| 31.0 mi | Broadway 3 - Uc Merced 1 Merced, CA | Solar | 1 MW | Mn8 Energy Llc |
| 31.0 mi | Costa View Farms Madera, CA | Solar | 5 MW | 127 Cvf, Llc |
| 31.1 mi | Uc Merced Solar Hybrid Merced, CA | Solar | 5 MW | Mn8 Energy Llc |
| 31.3 mi | Saint Agnes Medical Center Fresno, CA | Natural Gas | 7 MW | Saint Agnes Medical Center |
| 31.8 mi | Big Creek 2 Auberry, CA | Hydroelectric | 67 MW | Southern California Edison Co |
| 31.8 mi | Big Creek 2a Auberry, CA | Hydroelectric | 110 MW | Southern California Edison Co |
| 32.0 mi | Fresno Bullard High School Hybrid Fresno, CA | Solar | 2 MW | Forefront Power, Llc |
| 32.4 mi | Fresno Hoover High School Hybrid Fresno, CA | Solar | 1 MW | Forefront Power, Llc |
| 32.8 mi | Diamond H Dairy Power Chowchilla, CA | Biomass | 2 MW | Madera Dp 2, Llc |
| 33.3 mi | Csu Fresno Solar Project Fresno, CA | Solar | 1 MW | Mma Fresno Power Lp |
| 33.3 mi | Mission Solar Llc Merced, CA | Solar | 2 MW | Ecos Energy Llc |
| 33.4 mi | Merced Solar Llc Merced, CA | Solar | 2 MW | Ecos Energy Llc |
| 33.7 mi | Clovis High School Clovis, CA | Solar | 1 MW | Tesla Inc. |
| 33.7 mi | East Cleveland Road Solar El Nido, CA | Solar | 3 MW | Rpca Solar 7, Llc |
| 34.1 mi | Parker Snelling, CA | Hydroelectric | 3 MW | Merced Irrigation District |
| 34.4 mi | El Nido Facility El Nido, CA | Biomass | 13 MW | Merced Power Llc |
| 35.0 mi | 2097 Helton Solar Project Merced, CA | Solar | 2 MW | Solarenewal Llc |
| 35.3 mi | J S Eastwood Shaver Lake, CA | Hydroelectric | 200 MW | Southern California Edison Co |
| 35.4 mi | Big Creek 1 Big Creek, CA | Hydroelectric | 88 MW | Southern California Edison Co |
| 35.6 mi | Clovis East High School Clovis, CA | Solar | 1 MW | Tesla Inc. |
| 35.6 mi | Gap Pacific Distribution Center Fresno, CA | Solar | 2 MW | Mn8 Energy Llc |
| 35.7 mi | Scccd - Fresno Community College Fresno, CA | Solar | 2 MW | Forefront Power, Llc |
| 38.6 mi | Ca - Fresno, City Of - Se Surface Wtp Fresno, CA | Solar | — | Forefront Power, Llc |
| 38.7 mi | Fresno Sunnyside High School Hybrid Fresno, CA | Solar | 2 MW | Forefront Power, Llc |
| 38.8 mi | Ok Produce Fresno Carport Fresno, CA | Solar | 2 MW | Ok Produce |
| 39.2 mi | Wonderful Firebaugh Firebaugh, CA | Solar | 5 MW | Wonderful Renewable Energy, Llc. |
| 39.5 mi | Portal Lakeshore, CA | Hydroelectric | 11 MW | Southern California Edison Co |
| 39.7 mi | Wonderful Orchards - New Columbia Firebaugh, CA | Solar | 5 MW | Wonderful Renewable Energy, Llc. |
| 39.8 mi | Fresno-Clovis Rwrf Fresno, CA | Solar | — | Forefront Power, Llc |
| 40.3 mi | Fresno Community Solar Fresno, CA | Solar | 10 MW | Fresno Community Solar Developers, Llc |
| 40.5 mi | Jd Foods - Jd Foods Fresno, CA | Solar | 2 MW | Barrier Solar Inc |
| 41.2 mi | La Grange La Grange, CA | Hydroelectric | 5 MW | Turlock Irrigation District |
| 41.4 mi | Acid Bess Fresno, CA | Battery Storage | 97 MW | Malaga Bess Llc |
| 41.4 mi | City Of Atwater Nem Atwater, CA | Solar | 2 MW | Socore Energy Llc |
| 41.4 mi | Malaga Power Llc Fresno, CA | Natural Gas | 121 MW | Calpeak Power, Llc |
| 41.5 mi | Don Pedro La Grange, CA | Hydroelectric | 171 MW | Turlock Irrigation District |
| 41.5 mi | Upper Dawson La Grange, CA | Hydroelectric | 4 MW | Turlock Irrigation District |
| 41.6 mi | R C Kirkwood Groveland, CA | Hydroelectric | 116 MW | City & County Of San Francisco |
| 41.6 mi | Vitro Flat Glass Llc Fresno, CA | Oil | 3 MW | Vitro Flat Glass Llc |
| 41.6 mi | Rio Bravo Fresno Fresno, CA | Biomass | 28 MW | Rio Bravo Fresno |
| 41.7 mi | La Joya Del Sol Fresno, CA | Solar | 2 MW | Cvi Cleancapital Solar 1 Llc |
| 42.9 mi | Kings River Syphon Sanger, CA | Hydroelectric | 1 MW | Orange Cove Irrigation District |
| 43.0 mi | Dion R Holm Groveland, CA | Hydroelectric | 157 MW | City & County Of San Francisco |
| 43.2 mi | Pine Flat Piedra, CA | Hydroelectric | 165 MW | Kings River Conservation Dist |
| 43.3 mi | Moccasin Moccasin, CA | Hydroelectric | 100 MW | City & County Of San Francisco |
| 43.5 mi | Ca - Fresno County - Juvenile Hall Fresno, CA | Solar | 3 MW | Forefront Power, Llc |
| 43.8 mi | Dos Palos Cooperative Gin Dos Palos, CA | Solar | 1 MW | A2b Development Llc Dba Mars Energy Development |
| 44.1 mi | Moccasin Low Head Hydro Project Moccasin, CA | Hydroelectric | 3 MW | City & County Of San Francisco |
| 44.6 mi | Henry Miller Rd Dos Palos, CA | Solar | 2 MW | Henry Miller Reclamation District |
| 44.8 mi | Algonquin Power Sanger Llc Sanger, CA | Natural Gas | 62 MW | Algonquin Power Sanger Llc |
| 45.0 mi | Calrenew-1 Mendota, CA | Solar | 5 MW | Calrenew-1 Llc |
| 45.1 mi | Covanta Mendota Mendota, CA | Biomass | 28 MW | Clean Energy Systems Mendota |
| 45.4 mi | Sun Harvest Solar Ndp1 Dos Palos, CA | Solar | 2 MW | Altus Power America Management, Llc |
| 45.6 mi | Turlock Lake Hickman, CA | Hydroelectric | 3 MW | Turlock Irrigation District |
| 45.8 mi | Pom Plant 2 Del Rey, CA | Solar | 2 MW | Wonderful Renewable Energy, Llc. |
| 45.9 mi | Pom Plant 1 Del Rey, CA | Solar | 2 MW | Wonderful Renewable Energy, Llc. |
| 46.1 mi | Dos Palos Dos Palos, CA | Solar | 1 MW | Greenbacker Renewable Energy Corporation |
| 46.1 mi | Dos Palos Clean Power Dos Palos, CA | Solar | 3 MW | Dos Palos Clean Power, Llc |
| 46.6 mi | National Raisin Fowler, CA | Solar | 3 MW | National Raisin |
| 46.7 mi | West Tambo Clean Power Ii Livingston, CA | Solar | 2 MW | West Tambo Clean Power Ii |
| 47.4 mi | Fresno Cogen Partners San Joaquin, CA | Natural Gas | 87 MW | Wellhead Services, Inc |
| 47.5 mi | Fresno Solar San Joaquin, CA | Solar | 3 MW | Wellhead Services, Inc |
| 47.5 mi | Merced 2 Bess Dos Palos, CA | Battery Storage | — | Zglobal Inc |
| 47.6 mi | Crystal Farms Local Solar San Joaquin, CA | Solar | 4 MW | Crystal Farms Local Solar, Llc |
Power generation near this area
There are 100 power plants within 50 miles of Raymond, California (ZIP 93653), with a combined 2,777 MW of nameplate capacity. Solar is the most common fuel type in this area with 55 of the 100 nearby plants. The closest plant is Site 980 65 at 15.4 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in California, visit the California state page.
← Search a different location · Printable proximity report →