Power Plants Near 93608 — Cantua Creek, CA
100 power plants within 50 miles of ZIP 93608 (Cantua Creek, California). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 36.4921, -120.3353 · County: Fresno
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 2.8 mi | Giffen Tbd, CA | Solar | 10 MW | Pacific Gas & Electric Co. |
| 3.8 mi | Giffen Solar Park Cantua Creek, CA | Solar | 20 MW | Giffen Solar Park, Llc |
| 4.3 mi | Aspiration G Cantua Creek, CA | Solar | 9 MW | Aes Distributed Energy |
| 4.5 mi | Superior Almond Hulling Cantua Creek, CA | Solar | 2 MW | Renewable Solar, Inc |
| 4.7 mi | Cantua Solar Station Tbd, CA | Solar | 20 MW | Pacific Gas & Electric Co. |
| 6.6 mi | Great Valley Solar Portfolio Holdings, L Cantua Creek, CA | Solar | 203 MW | Consolidated Edison Development Inc. |
| 7.3 mi | Re Tranquillity Cantua Creek, CA | Solar | 277 MW | Southern Power Co |
| 7.4 mi | Scarlet Solar (Ca) Fresno, CA | Solar | 240 MW | Edp Renewables North America Llc |
| 7.9 mi | Luna Valley Mendota, CA | Solar | — | Luna Valley Solar I, Llc |
| 8.0 mi | Scarlet Ii Hybrid Cantua Creek, CA | Solar | 350 MW | Edpr Scarlet Ii Llc |
| 9.0 mi | Re Adams East, Llc Fresno, CA | Solar | 19 MW | Onward Energy |
| 9.1 mi | Five Points Solar Park Five Points, CA | Solar | 60 MW | Boralex Us Operations Llc |
| 9.5 mi | Edpr Ca Solar Park Vi Llc (Ca) Hybrid Mendota, CA | Solar | — | Edpr Ca Solar Park Vi Llc |
| 10.6 mi | San Joaquin Solar Helm, CA | Solar | 21 MW | Gasna 6p, Llc |
| 11.8 mi | Radial O'neil Rooftop Coalinga, CA | Solar | — | Radial O'neil Rooftop, Llc |
| 11.9 mi | Tranquillity Id Tranquillity, CA | Solar | 1 MW | Tranquillity Solar 1, Llc |
| 13.0 mi | Stroud Solar Station Helm, CA | Solar | 20 MW | Pacific Gas & Electric Co. |
| 13.1 mi | Helms Energy Center Helm, CA | Natural Gas | — | Wellhead Services, Inc |
| 13.2 mi | Crystal Farms Local Solar San Joaquin, CA | Solar | 4 MW | Crystal Farms Local Solar, Llc |
| 13.2 mi | Van Der Hoek Solar Array/ Dairy Helm, CA | Solar | 2 MW | Maas Energy Works |
| 13.5 mi | Nextera Westside Pv Five Points, CA | Solar | 20 MW | Westside Solar, Llc |
| 13.5 mi | Whitney Point Solar Five Points, CA | Solar | 20 MW | Whitney Point Solar, Llc |
| 14.1 mi | Westside Solar Station Five Points, CA | Solar | 15 MW | Pacific Gas & Electric Co. |
| 14.4 mi | Five Points Solar Station Five Points, CA | Solar | 15 MW | Pacific Gas & Electric Co. |
| 15.4 mi | Fresno Solar San Joaquin, CA | Solar | 3 MW | Wellhead Services, Inc |
| 15.7 mi | Fresno Cogen Partners San Joaquin, CA | Natural Gas | 87 MW | Wellhead Services, Inc |
| 16.1 mi | Little Bear Solar 1, Llc Mendota, CA | Solar | 40 MW | Little Bear Solar 1, Llc (Longroad) |
| 16.1 mi | Little Bear 3 Mendota, CA | Solar | 20 MW | Little Bear Solar 3, Llc (Longroad) |
| 16.1 mi | Little Bear 4 Mendota, CA | Solar | 50 MW | Little Bear Solar 4, Llc (Longroad) |
| 16.1 mi | Little Bear 5 Mendota, CA | Solar | 50 MW | Little Bear Solar 5, Llc (Longroad) |
| 16.1 mi | Conflitti Solar Firebaugh, CA | Solar | — | Ces Electron Farm One, Llc |
| 16.9 mi | Citizen B Mendota, CA | Solar | 5 MW | Aes Distributed Energy |
| 17.0 mi | North Star Solar Mendota, CA | Solar | 62 MW | Southern Power Co |
| 17.1 mi | Open Sky Ranch Inc Riverdale, CA | Solar | 2 MW | Bravo Rec Management Llc |
| 17.1 mi | Open Sky Dairy Riverdale, CA | Solar | 2 MW | Renewable Solar, Inc |
| 17.5 mi | Iron Bess Firebaugh, CA | Battery Storage | — | Panoche Bess Llc |
| 17.5 mi | Midway Bess Firebaugh, CA | Battery Storage | — | Midway Bess Llc |
| 17.5 mi | Wellhead Power Panoche Firebaugh, CA | Natural Gas | 57 MW | Wellhead Services, Inc |
| 17.5 mi | Harris Farms Solar Facility Coalinga, CA | Solar | 1 MW | Harris Farms Inc |
| 17.6 mi | Calpeak Power Panoche Peaker Plant Firebaugh, CA | Natural Gas | 117 MW | Calpeak Power, Llc |
| 17.6 mi | Midway Peaking Llc Firebaugh, CA | Natural Gas | 140 MW | Calpeak Power, Llc |
| 17.6 mi | Panoche Energy Center Firebaugh, CA | Natural Gas | 432 MW | Panoche Energy Center, Llc |
| 17.9 mi | Rp Farmers Coop 1 Coalinga, CA | Solar | — | Rp Farmers Coop 1, Llc |
| 18.3 mi | Covanta Mendota Mendota, CA | Biomass | 28 MW | Clean Energy Systems Mendota |
| 18.4 mi | Calrenew-1 Mendota, CA | Solar | 5 MW | Calrenew-1 Llc |
| 18.4 mi | Jd Wilson Dairy Riverdale, CA | Solar | — | Renewable Solar, Inc |
| 19.7 mi | Coalinga 6c Cogen Coalinga, CA | Natural Gas | 7 MW | Chevron Usa Inc |
| 21.7 mi | Coalinga Cogeneration Coalinga, CA | Natural Gas | 38 MW | Coalinga Cogeneration Co |
| 22.2 mi | Van Der Kooi Dairy Solar Array Riverdale, CA | Solar | 1 MW | Maas Energy Works |
| 22.3 mi | Coalinga Cogeneration Facility Coalinga, CA | Natural Gas | 7 MW | Aera Energy Llc-Coalinga |
| 22.8 mi | Firebaugh-Ccs-Pv-1 Firebaugh, CA | Solar | 1 MW | Mike Woolf Farming |
| 23.0 mi | Wonderful Orchards - New Columbia Firebaugh, CA | Solar | 5 MW | Wonderful Renewable Energy, Llc. |
| 23.5 mi | Coalinga 25d Cogen Coalinga, CA | Natural Gas | 14 MW | Chevron Usa Inc |
| 23.8 mi | Wonderful Firebaugh Firebaugh, CA | Solar | 5 MW | Wonderful Renewable Energy, Llc. |
| 25.0 mi | Gates Solar Station Huron, CA | Solar | 20 MW | Pacific Gas & Electric Co. |
| 25.3 mi | Cdcr (Ca) - Pleasant Valley State Prison Coalinga, CA | Solar | 1 MW | Team-Solar, Inc. |
| 25.4 mi | Dsh (Ca) - Coalinga State Hospital Coalinga, CA | Solar | 2 MW | Team-Solar, Inc. |
| 25.4 mi | Ca-Dgs Rfp-Pleasant Valley State Prison Coalinga, CA | Solar | 2 MW | Forefront Power, Llc |
| 25.7 mi | Gates Peaker Huron, CA | Natural Gas | — | Wellhead Services, Inc |
| 26.7 mi | West Gates Solar Station Huron, CA | Solar | 10 MW | Pacific Gas & Electric Co. |
| 26.7 mi | Fifth Standard Solar Pv, Llc (Hybrid) Huron, CA | Solar | 287 MW | Big Sky Wind, Llc |
| 27.1 mi | Key Energy Storage Huron, CA | Battery Storage | — | Key Energy Storage Llc |
| 27.3 mi | Sand Luis West Huron, CA | Solar | — | Origis Energy Usa, Inc |
| 27.4 mi | Huron Solar Station Huron, CA | Solar | 20 MW | Pacific Gas & Electric Co. |
| 28.4 mi | Westlands Solar Pv Farm Huron, CA | Solar | 18 MW | Boralex Us Operations Llc |
| 28.6 mi | Fresno-Clovis Rwrf Fresno, CA | Solar | — | Forefront Power, Llc |
| 28.7 mi | Fresno Community Solar Fresno, CA | Solar | 10 MW | Fresno Community Solar Developers, Llc |
| 29.6 mi | Electrolyte Bess Lemoore, CA | Battery Storage | — | Henrietta Bess Llc |
| 29.6 mi | Henrietta Peaker Lemoore, CA | Natural Gas | 98 MW | Mrp San Joaquin Energy Llc. |
| 29.9 mi | American Kings Solar, Llc Lemoore, CA | Solar | 128 MW | Mn8 Energy Llc |
| 30.1 mi | Henrietta D Energy Storage Llc Lemoore, CA | Other Fossil | 10 MW | Convergent Energy And Power Lp |
| 30.1 mi | Kings Csg 3 Llc Community Solar Lemoore, CA | Solar | 3 MW | Dimension Energy Llc |
| 30.2 mi | Re Kent South, Llc Lemoore, CA | Solar | 20 MW | Onward Energy |
| 30.4 mi | Westside Solar Power Pv1 Lemoore, CA | Solar | 2 MW | Westside Assets Llc |
| 30.5 mi | Re Mustang Llc Lemoore, CA | Solar | 175 MW | Mn8 Energy Llc |
| 30.6 mi | Almond Lemoore, CA | Solar | 20 MW | Westlands Almond Llc |
| 30.6 mi | Slate Hybrid Stratford, CA | Solar | 440 MW | Mn8 Energy Llc |
| 31.0 mi | Mustang Two Lemoore, CA | Solar | 150 MW | Re Mustang Two Llc |
| 31.5 mi | Lemoore West Lemoore, CA | Solar | 8 MW | Leprino Foods |
| 31.6 mi | Panoche Valley Solar Farm Paicines, CA | Solar | 140 MW | Consolidated Edison Development Inc. |
| 31.8 mi | Aquamarine Lemoore, CA | Solar | 250 MW | Aquamarine Westside Llc |
| 31.9 mi | Zonneveld Oak Grove Laton, CA | Solar | 2 MW | Renewable Solar, Inc |
| 32.2 mi | Ardagh Solar Madera, CA | Solar | — | Kdc Solar Madera, Llc |
| 32.3 mi | Oro Loma Oro Loma, CA | Solar | 20 MW | Consolidated Edison Development Inc. |
| 32.5 mi | La Joya Del Sol Fresno, CA | Solar | 2 MW | Cvi Cleancapital Solar 1 Llc |
| 32.5 mi | City Of Madera Wwtp Madera, CA | Solar | 1 MW | Sune Gil1, Llc |
| 32.5 mi | Solar Blue Lemoore, CA | Solar | 475 MW | Westlands Solar Blue (Oz) Owner, Llc |
| 32.6 mi | Kdc Solar Madera Llc Madera, CA | Solar | 10 MW | Valta Energy |
| 32.6 mi | Re Kansas Solar, Llc Lemoore, CA | Solar | 20 MW | Onward Energy |
| 33.2 mi | Chestnut Lemoore, CA | Solar | 286 MW | Castanea Project Llc |
| 33.4 mi | Re Kansas South Llc Lemoore, CA | Solar | 20 MW | Re Kansas South Llc |
| 33.9 mi | Grape Lemoore, CA | Solar | — | Westlands Grape, Llc |
| 34.0 mi | Java Solar, Llc Lemoore, CA | Solar | 14 MW | Java Solar, Llc |
| 34.0 mi | Lemoore 1 Lemoore, CA | Solar | 2 MW | Aes Distributed Energy |
| 34.3 mi | Cherry Lemoore, CA | Solar | — | Westlands Cherry, Llc |
| 34.4 mi | Costa View Farms Madera, CA | Solar | 5 MW | 127 Cvf, Llc |
| 34.9 mi | Madera Community Hospital Madera, CA | Solar | 1 MW | Cleancapital Holdings |
| 34.9 mi | Sealed Air Madera Solar Project Madera, CA | Solar | 4 MW | Sealed Air Corporation |
| 35.0 mi | Ok Produce Fresno Carport Fresno, CA | Solar | 2 MW | Ok Produce |
| 35.0 mi | Henrietta Solar Project Lemoore, CA | Solar | 102 MW | Southern Power Co |
Power generation near this area
There are 100 power plants within 50 miles of Cantua Creek, California (ZIP 93608), with a combined 5,284 MW of nameplate capacity. Solar is the most common fuel type in this area with 82 of the 100 nearby plants. The closest plant is Giffen at 2.8 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in California, visit the California state page.
← Search a different location · Printable proximity report →