Power Plants Near 93620 — Dos Palos, CA
100 power plants within 50 miles of ZIP 93620 (Dos Palos, California). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 37.0025, -120.6333 · County: Merced
| Distance | Plant | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| 0.3 mi | Dos Palos Clean Power Dos Palos, CA | Solar | 3 MW | Dos Palos Clean Power LLC |
| 1.7 mi | Merced 2 BESS Dos Palos, CA | Battery Storage | 2 MW | ZGlobal Inc |
| 3.6 mi | Henry Miller RD Dos Palos, CA | Solar | 2 MW | Henry Miller Reclamation District |
| 4.0 mi | Sun Harvest Solar NDP1 Dos Palos, CA | Solar | 2 MW | Altus Power America Management, LLC |
| 5.6 mi | Dos Palos Cooperative Gin Dos Palos, CA | Solar | 1 MW | A2B Development LLC dba Mars Energy Development |
| 7.7 mi | Althea Avenue Solar Firebaugh, CA | Solar | 5 MW | RPCA Solar 8, LLC |
| 8.9 mi | Oro Loma Oro Loma, CA | Solar | 20 MW | RWE Clean Energy |
| 10.5 mi | OWC Energy Holdings, LLC Firebaugh, CA | Solar | 2 MW | Headwater Energy, LLC |
| 11.6 mi | Vega Solar Los Banos, CA | Solar | 20 MW | Vega Solar, LLC |
| 12.9 mi | East Cleveland Road Solar El Nido, CA | Solar | 3 MW | RPCA Solar 7, LLC |
| 13.5 mi | Merced 1 PV Los Banos, CA | Solar | 3 MW | ZGlobal Inc |
| 13.5 mi | Lara 2 Hybrid Los Banos, CA | Battery Storage | 2 MW | ZGlobal Inc |
| 14.4 mi | Diamond H Dairy Power Chowchilla, CA | Biomass | 2 MW | Madera DP 2, LLC |
| 14.4 mi | Godinho Dairy Digester Los Banos, CA | Biomass | 2 MW | Aligned Digesters Co., LLC |
| 15.0 mi | El Nido Facility El Nido, CA | Biomass | 13 MW | Merced Power LLC |
| 16.4 mi | Merced Pipeline Merced, CA | Solar | 4 MW | Maas Energy Works |
| 17.9 mi | Wright Solar Park Los Banos, CA | Solar | 200 MW | Wright Solar Park LLC |
| 18.0 mi | Costa View Farms Madera, CA | Solar | 5 MW | 127 Cvf, LLC |
| 18.5 mi | Firebaugh-CCS-PV-1 Firebaugh, CA | Solar | 1 MW | Mike Woolf Farming |
| 18.8 mi | City of Atwater NEM Atwater, CA | Solar | 2 MW | SoCore Energy LLC |
| 18.9 mi | Adera Solar Chowchilla, CA | Solar | 20 MW | AES Distributed Energy |
| 20.1 mi | Merced Solar LLC Merced, CA | Solar | 2 MW | Ecos Energy LLC |
| 20.1 mi | Mission Solar LLC Merced, CA | Solar | 2 MW | Ecos Energy LLC |
| 20.5 mi | Five H Farms Solar Array Merced, CA | Solar | 1 MW | Maas Energy Works |
| 20.8 mi | Wonderful Firebaugh Firebaugh, CA | Solar | 5 MW | Wonderful Renewable Energy, LLC. |
| 21.3 mi | Wonderful Orchards - New Columbia Firebaugh, CA | Solar | 5 MW | Wonderful Renewable Energy, LLC. |
| 22.2 mi | Citizen B Mendota, CA | Solar | 5 MW | AES Distributed Energy |
| 22.4 mi | Ampersand Chowchilla Biomass LLC Chowchilla, CA | Biomass | 13 MW | Ampersand Chowchilla Biomass LLC |
| 22.4 mi | Chowchilla II Chowchilla, CA | Natural Gas | 50 MW | California Power Holdings LLC |
| 22.5 mi | CalRenew-1 Mendota, CA | Solar | 5 MW | CalRenew-1 LLC |
| 22.5 mi | North Star Solar Mendota, CA | Solar | 62 MW | Southern Power Co |
| 22.6 mi | Covanta Mendota Mendota, CA | Biomass | 28 MW | Clean Energy Systems Mendota |
| 23.2 mi | Little Bear Solar 1, LLC Mendota, CA | Solar | 40 MW | Little Bear Solar 1, LLC (Longroad) |
| 23.2 mi | Little Bear 3 Mendota, CA | Solar | 20 MW | Little Bear Solar 3, LLC (Longroad) |
| 23.2 mi | Little Bear 4 Mendota, CA | Solar | 50 MW | Little Bear Solar 4, LLC (Longroad) |
| 23.2 mi | Little Bear 5 Mendota, CA | Solar | 50 MW | Little Bear Solar 5, LLC (Longroad) |
| 23.8 mi | ONeill Los Banos, CA | Hydroelectric | 25 MW | U S Bureau of Reclamation |
| 24.3 mi | Midway Peaking LLC Firebaugh, CA | Natural Gas | 140 MW | CalPeak Power, LLC |
| 24.3 mi | Wellhead Power Panoche Firebaugh, CA | Natural Gas | 57 MW | Wellhead Services, Inc |
| 24.3 mi | CalPeak Power Panoche Peaker Plant Firebaugh, CA | Natural Gas | 61 MW | CalPeak Power, LLC |
| 24.4 mi | Panoche Energy Center Firebaugh, CA | Natural Gas | 432 MW | Panoche Energy Center, LLC |
| 24.7 mi | Quinto Solar PV Project Gustine, CA | Solar | 108 MW | Arevon Energy, Inc. |
| 24.9 mi | W R Gianelli Gustine, CA | Hydroelectric | 424 MW | California Dept. of Water Resources |
| 25.1 mi | 2097 Helton Solar Project Merced, CA | Solar | 2 MW | Solarenewal LLC |
| 25.2 mi | West Tambo Clean Power II Livingston, CA | Solar | 2 MW | West Tambo Clean Power II |
| 26.0 mi | Madera 1 PV Madera, CA | Solar | 2 MW | ZGlobal Inc |
| 26.1 mi | Conflitti Solar Firebaugh, CA | Solar | 4 MW | CES Electron Farm One, LLC |
| 26.5 mi | Avenue 26 Solar Chowchilla, CA | Solar | 8 MW | RPCA Solar 1, LLC |
| 26.6 mi | City of Madera WWTP Madera, CA | Solar | 1 MW | SunE GIL1, LLC |
| 27.3 mi | DGS Central California Womens Facility Chowchilla, CA | Solar | 2 MW | Forefront Power, LLC |
| 27.3 mi | DGS Valley State Prison Chowchilla, CA | Solar | 2 MW | Forefront Power, LLC |
| 27.4 mi | Broadway 3 - UC Merced 1 Merced, CA | Solar | 1 MW | MN8 Energy LLC |
| 27.4 mi | UC Merced Solar Hybrid Merced, CA | Solar | 5 MW | MN8 Energy LLC |
| 27.7 mi | Gonzaga Ridge Wind Farm Hollister, CA | Wind | 133 MW | Gonzaga Ridge Wind Farm, LLC |
| 29.3 mi | Panoche Valley Solar Farm Paicines, CA | Solar | 140 MW | RWE Clean Energy |
| 29.7 mi | KDC Solar Madera LLC Madera, CA | Solar | 10 MW | TRITEC Americas |
| 29.8 mi | Dinosaur Point Los Banos, CA | Wind | 17 MW | International Turbine Res Inc |
| 30.9 mi | Central 40 Newman, CA | Solar | 40 MW | Central 40, LLC |
| 31.0 mi | Scarlet II Hybrid Cantua Creek, CA | Solar | 350 MW | EDPR Scarlet II LLC |
| 31.1 mi | Luna Valley Mendota, CA | Solar | 200 MW | Luna Valley Solar I, LLC |
| 31.2 mi | Gonzaga Ridge Battery Facility Hollister, CA | Battery Storage | 52 MW | Gonzaga Ridge Battery Facility, LLC |
| 31.7 mi | RE Tranquillity Cantua Creek, CA | Solar | 277 MW | Southern Power Co |
| 31.7 mi | Scarlet Solar (CA) Fresno, CA | Solar | 240 MW | EDP Renewables North America LLC |
| 32.1 mi | Sealed Air Madera Solar Project Madera, CA | Solar | 4 MW | Sealed Air Corporation |
| 32.3 mi | Great Valley Solar Portfolio Holdings, L Cantua Creek, CA | Solar | 203 MW | RWE Clean Energy |
| 32.4 mi | CA - Madera USD - Madera South HS Madera, CA | Solar | 1 MW | Forefront Power, LLC |
| 32.5 mi | Tranquillity ID Tranquillity, CA | Solar | 1 MW | Tranquillity Solar 1, LLC |
| 32.7 mi | RE Adams East, LLC Fresno, CA | Solar | 19 MW | Onward Energy |
| 32.7 mi | Madera Community Hospital Madera, CA | Solar | 1 MW | CleanCapital Holdings |
| 34.4 mi | Parker Snelling, CA | Hydroelectric | 3 MW | Merced Irrigation District |
| 34.8 mi | Aspiration G Cantua Creek, CA | Solar | 9 MW | AES Distributed Energy |
| 35.9 mi | Crystal Farms Local Solar San Joaquin, CA | Solar | 4 MW | Agilitas Energy, Inc. |
| 36.2 mi | Giffen Solar Park Cantua Creek, CA | Solar | 20 MW | Giffen Solar Park, LLC |
| 36.5 mi | Walnut Energy Center Turlock, CA | Natural Gas | 301 MW | Turlock Irrigation District |
| 36.9 mi | Walnut Turlock, CA | Natural Gas | 50 MW | Turlock Irrigation District |
| 37.0 mi | Pacific Ethanol Madera Solar Array Madera, CA | Solar | 4 MW | Seaboard Energy California, LLC |
| 37.1 mi | Giffen Tbd, CA | Solar | 10 MW | Pacific Gas & Electric Co. |
| 37.4 mi | Borden Solar Farm Madera, CA | Solar | 50 MW | 41MB 8me, LLC |
| 37.7 mi | Paulsell Crows Landing, CA | Solar | 35 MW | Crow Creek Solar, LLC |
| 37.8 mi | Frontier Solar LLC Newman, CA | Solar | 20 MW | Boralex US Operations LLC |
| 39.5 mi | Fresno Solar San Joaquin, CA | Solar | 3 MW | Wellhead Services, Inc |
| 39.6 mi | Merced Falls Snelling, CA | Hydroelectric | 3 MW | Merced Irrigation District |
| 39.8 mi | Fresno Cogen Partners San Joaquin, CA | Natural Gas | 87 MW | Wellhead Services, Inc |
| 40.1 mi | McSwain Snelling, CA | Hydroelectric | 9 MW | Merced Irrigation District |
| 40.1 mi | Proxima Crows Landing, CA | Solar | 352 MW | Proxima Solar, LLC |
| 40.6 mi | Enchanted Rock Turlock Irrigation Distri Patterson, CA | Natural Gas | 47 MW | Enchanted Rock |
| 40.6 mi | Site 980 65 Madera, CA | Hydroelectric | 2 MW | Madera-Chowchilla Power Auth |
| 41.0 mi | Superior Almond Hulling Cantua Creek, CA | Solar | 2 MW | Renewable Solar, Inc |
| 42.1 mi | Turlock Lake Hickman, CA | Hydroelectric | 3 MW | Turlock Irrigation District |
| 42.4 mi | San Joaquin Solar San Joaquin, CA | Solar | 21 MW | Gasna 6p, LLC |
| 43.0 mi | Cantua Solar Station Tbd, CA | Solar | 20 MW | Pacific Gas & Electric Co. |
| 43.2 mi | Hickman Hickman, CA | Hydroelectric | 1 MW | Turlock Irrigation District |
| 43.6 mi | Amazon - Patterson PV Patterson, CA | Solar | 3 MW | AES Distributed Energy |
| 43.7 mi | Stroud Solar Station Helm, CA | Solar | 20 MW | Pacific Gas & Electric Co. |
| 44.0 mi | Almond Power Plant Modesto, CA | Natural Gas | 224 MW | Turlock Irrigation District |
| 44.2 mi | Enerparc CA1 LLC Hollister, CA | Solar | 2 MW | CleanCapital Holdings |
| 44.9 mi | Exchequer Snelling, CA | Hydroelectric | 95 MW | Merced Irrigation District |
| 45.0 mi | Hollister Solar LLC Hollister, CA | Solar | 2 MW | Ecos Energy LLC |
| 45.4 mi | Van der Hoek Solar Array/ Dairy Helm, CA | Solar | 2 MW | Maas Energy Works |
| 45.7 mi | Upper Dawson La Grange, CA | Hydroelectric | 4 MW | Turlock Irrigation District |
Power generation near this area
There are 100 power plants within 50 miles of Dos Palos, California (ZIP 93620), with a combined 5,016 MW of nameplate capacity. Solar is the most common fuel type in this area with 70 of the 100 nearby plants. The closest plant is Dos Palos Clean Power at 0.3 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in California, visit the California state page.
← Search a different location · Printable proximity report →