Power Plants Near 93638 — Madera, CA
100 power plants within 50 miles of ZIP 93638 (Madera, California). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 37.0402, -120.0335 · County: Madera
| Distance | Plant | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| 6.3 mi | CA - Madera USD - Madera South HS Madera, CA | Solar | 1 MW | Forefront Power, LLC |
| 6.7 mi | Sealed Air Madera Solar Project Madera, CA | Solar | 4 MW | Sealed Air Corporation |
| 6.9 mi | Madera Community Hospital Madera, CA | Solar | 1 MW | CleanCapital Holdings |
| 7.3 mi | DGS Central California Womens Facility Chowchilla, CA | Solar | 2 MW | Forefront Power, LLC |
| 7.4 mi | Madera 1 PV Madera, CA | Solar | 2 MW | ZGlobal Inc |
| 7.5 mi | Site 980 65 Madera, CA | Hydroelectric | 2 MW | Madera-Chowchilla Power Auth |
| 7.8 mi | DGS Valley State Prison Chowchilla, CA | Solar | 2 MW | Forefront Power, LLC |
| 8.0 mi | Borden Solar Farm Madera, CA | Solar | 50 MW | 41MB 8me, LLC |
| 8.8 mi | KDC Solar Madera LLC Madera, CA | Solar | 10 MW | TRITEC Americas |
| 9.2 mi | Pacific Ethanol Madera Solar Array Madera, CA | Solar | 4 MW | Seaboard Energy California, LLC |
| 9.7 mi | City of Madera WWTP Madera, CA | Solar | 1 MW | SunE GIL1, LLC |
| 10.0 mi | Avenue 26 Solar Chowchilla, CA | Solar | 8 MW | RPCA Solar 1, LLC |
| 12.7 mi | Ampersand Chowchilla Biomass LLC Chowchilla, CA | Biomass | 13 MW | Ampersand Chowchilla Biomass LLC |
| 12.7 mi | Chowchilla II Chowchilla, CA | Natural Gas | 50 MW | California Power Holdings LLC |
| 15.3 mi | Five H Farms Solar Array Merced, CA | Solar | 1 MW | Maas Energy Works |
| 15.5 mi | Costa View Farms Madera, CA | Solar | 5 MW | 127 Cvf, LLC |
| 17.0 mi | Adera Solar Chowchilla, CA | Solar | 20 MW | AES Distributed Energy |
| 18.4 mi | Friant Hydro Facility Friant, CA | Hydroelectric | 38 MW | Friant Power Authority |
| 18.8 mi | Diamond H Dairy Power Chowchilla, CA | Biomass | 2 MW | Madera DP 2, LLC |
| 19.4 mi | Clovis North High School Fresno, CA | Solar | 1 MW | Tesla Inc. |
| 19.7 mi | Fresno Bullard High School Hybrid Fresno, CA | Solar | 2 MW | Forefront Power, LLC |
| 19.8 mi | SCCCD - Clovis Community College Fresno, CA | Solar | 1 MW | Forefront Power, LLC |
| 20.5 mi | Saint Agnes Medical Center Fresno, CA | Natural Gas | 7 MW | Saint Agnes Medical Center |
| 21.1 mi | Fresno Hoover High School Hybrid Fresno, CA | Solar | 1 MW | Forefront Power, LLC |
| 21.2 mi | Wonderful Firebaugh Firebaugh, CA | Solar | 5 MW | Wonderful Renewable Energy, LLC. |
| 21.6 mi | Wonderful Orchards - New Columbia Firebaugh, CA | Solar | 5 MW | Wonderful Renewable Energy, LLC. |
| 22.7 mi | CSU Fresno Solar Project Fresno, CA | Solar | 1 MW | MMA Fresno Power LP |
| 22.9 mi | SCCCD - Fresno Community College Fresno, CA | Solar | 2 MW | Forefront Power, LLC |
| 24.1 mi | East Cleveland Road Solar El Nido, CA | Solar | 3 MW | RPCA Solar 7, LLC |
| 24.6 mi | Fresno-Clovis RWRF Fresno, CA | Solar | 17 MW | Forefront Power, LLC |
| 24.8 mi | Clovis High School Clovis, CA | Solar | 1 MW | Tesla Inc. |
| 25.2 mi | Fresno Community Solar Fresno, CA | Solar | 10 MW | Agilitas Energy, Inc. |
| 25.4 mi | Gap Pacific Distribution Center Fresno, CA | Solar | 2 MW | MN8 Energy LLC |
| 26.2 mi | OK Produce Fresno Carport Fresno, CA | Solar | 2 MW | OK Produce |
| 26.3 mi | Kerckhoff 2 Auberry, CA | Hydroelectric | 140 MW | Pacific Gas & Electric Co. |
| 26.7 mi | Kerckhoff Auberry, CA | Hydroelectric | 23 MW | Pacific Gas & Electric Co. |
| 26.8 mi | CalRenew-1 Mendota, CA | Solar | 5 MW | CalRenew-1 LLC |
| 26.9 mi | Covanta Mendota Mendota, CA | Biomass | 28 MW | Clean Energy Systems Mendota |
| 27.1 mi | El Nido Facility El Nido, CA | Biomass | 13 MW | Merced Power LLC |
| 27.3 mi | Clovis East High School Clovis, CA | Solar | 1 MW | Tesla Inc. |
| 27.4 mi | Fresno Sunnyside High School Hybrid Fresno, CA | Solar | 2 MW | Forefront Power, LLC |
| 28.2 mi | La Joya Del Sol Fresno, CA | Solar | 2 MW | CVI CleanCapital Solar 1 LLC |
| 28.3 mi | JD Foods - JD Foods Fresno, CA | Solar | 2 MW | Barrier Solar Inc |
| 29.0 mi | Merced Pipeline Merced, CA | Solar | 4 MW | Maas Energy Works |
| 29.1 mi | Acid BESS Fresno, CA | Battery Storage | 97 MW | Malaga BESS LLC |
| 29.2 mi | Malaga Power LLC Fresno, CA | Natural Gas | 121 MW | CalPeak Power, LLC |
| 29.2 mi | CA - Fresno, City of - SE Surface WTP Fresno, CA | Solar | 3 MW | Forefront Power, LLC |
| 29.2 mi | Crystal Farms Local Solar San Joaquin, CA | Solar | 4 MW | Agilitas Energy, Inc. |
| 29.3 mi | Mission Solar LLC Merced, CA | Solar | 2 MW | Ecos Energy LLC |
| 29.4 mi | Merced Solar LLC Merced, CA | Solar | 2 MW | Ecos Energy LLC |
| 29.5 mi | Fresno Cogen Partners San Joaquin, CA | Natural Gas | 87 MW | Wellhead Services, Inc |
| 29.5 mi | Fresno Solar San Joaquin, CA | Solar | 3 MW | Wellhead Services, Inc |
| 29.5 mi | Tranquillity ID Tranquillity, CA | Solar | 1 MW | Tranquillity Solar 1, LLC |
| 29.8 mi | Vitro Flat Glass LLC Fresno, CA | Oil | 3 MW | Vitro Flat Glass LLC |
| 29.9 mi | North Star Solar Mendota, CA | Solar | 62 MW | Southern Power Co |
| 30.1 mi | A G Wishon North Fork, CA | Hydroelectric | 13 MW | Pacific Gas & Electric Co. |
| 30.7 mi | Big Creek 4 North Fork, CA | Hydroelectric | 100 MW | Southern California Edison Co |
| 30.8 mi | Little Bear Solar 1, LLC Mendota, CA | Solar | 40 MW | Little Bear Solar 1, LLC (Longroad) |
| 30.8 mi | Little Bear 3 Mendota, CA | Solar | 20 MW | Little Bear Solar 3, LLC (Longroad) |
| 30.8 mi | Little Bear 4 Mendota, CA | Solar | 50 MW | Little Bear Solar 4, LLC (Longroad) |
| 30.8 mi | Little Bear 5 Mendota, CA | Solar | 50 MW | Little Bear Solar 5, LLC (Longroad) |
| 31.0 mi | Citizen B Mendota, CA | Solar | 5 MW | AES Distributed Energy |
| 31.2 mi | CA - Fresno County - Juvenile Hall Fresno, CA | Solar | 3 MW | Forefront Power, LLC |
| 31.3 mi | Broadway 3 - UC Merced 1 Merced, CA | Solar | 1 MW | MN8 Energy LLC |
| 31.4 mi | UC Merced Solar Hybrid Merced, CA | Solar | 5 MW | MN8 Energy LLC |
| 31.6 mi | San Joaquin 2 North Fork, CA | Hydroelectric | 3 MW | Pacific Gas & Electric Co. |
| 31.9 mi | San Joaquin 3 North Fork, CA | Hydroelectric | 4 MW | Pacific Gas & Electric Co. |
| 32.5 mi | RE Adams East, LLC Fresno, CA | Solar | 19 MW | Onward Energy |
| 33.2 mi | Henry Miller RD Dos Palos, CA | Solar | 2 MW | Henry Miller Reclamation District |
| 33.3 mi | Dos Palos Cooperative Gin Dos Palos, CA | Solar | 1 MW | A2B Development LLC dba Mars Energy Development |
| 33.5 mi | Dos Palos Clean Power Dos Palos, CA | Solar | 3 MW | Dos Palos Clean Power LLC |
| 33.8 mi | 2097 Helton Solar Project Merced, CA | Solar | 2 MW | Solarenewal LLC |
| 34.2 mi | Sun Harvest Solar NDP1 Dos Palos, CA | Solar | 2 MW | Altus Power America Management, LLC |
| 34.9 mi | Merced 2 BESS Dos Palos, CA | Battery Storage | 2 MW | ZGlobal Inc |
| 35.0 mi | National Raisin Fowler, CA | Solar | 3 MW | National Raisin |
| 35.4 mi | Stroud Solar Station Helm, CA | Solar | 20 MW | Pacific Gas & Electric Co. |
| 35.6 mi | Scarlet Solar (CA) Fresno, CA | Solar | 240 MW | EDP Renewables North America LLC |
| 35.6 mi | Scarlet II Hybrid Cantua Creek, CA | Solar | 350 MW | EDPR Scarlet II LLC |
| 35.6 mi | OWC Energy Holdings, LLC Firebaugh, CA | Solar | 2 MW | Headwater Energy, LLC |
| 35.9 mi | Althea Avenue Solar Firebaugh, CA | Solar | 5 MW | RPCA Solar 8, LLC |
| 36.0 mi | San Joaquin Solar San Joaquin, CA | Solar | 21 MW | Gasna 6p, LLC |
| 36.0 mi | POM Plant 2 Del Rey, CA | Solar | 2 MW | Wonderful Renewable Energy, LLC. |
| 36.2 mi | Algonquin Power Sanger LLC Sanger, CA | Natural Gas | 62 MW | Clearlight Energy Sanger LLC |
| 36.2 mi | POM Plant 1 Del Rey, CA | Solar | 2 MW | Wonderful Renewable Energy, LLC. |
| 36.4 mi | Big Creek 3 Auberry, CA | Hydroelectric | 175 MW | Southern California Edison Co |
| 36.6 mi | City of Atwater NEM Atwater, CA | Solar | 2 MW | SoCore Energy LLC |
| 36.6 mi | McSwain Snelling, CA | Hydroelectric | 9 MW | Merced Irrigation District |
| 36.8 mi | Oro Loma Oro Loma, CA | Solar | 20 MW | RWE Clean Energy |
| 37.0 mi | Great Valley Solar Portfolio Holdings, L Cantua Creek, CA | Solar | 203 MW | RWE Clean Energy |
| 37.1 mi | Luna Valley Mendota, CA | Solar | 200 MW | Luna Valley Solar I, LLC |
| 37.1 mi | Merced Falls Snelling, CA | Hydroelectric | 3 MW | Merced Irrigation District |
| 37.2 mi | Van der Hoek Solar Array/ Dairy Helm, CA | Solar | 2 MW | Maas Energy Works |
| 37.6 mi | Giffen Solar Park Cantua Creek, CA | Solar | 20 MW | Giffen Solar Park, LLC |
| 37.8 mi | Parker Snelling, CA | Hydroelectric | 3 MW | Merced Irrigation District |
| 37.8 mi | RE Tranquillity Cantua Creek, CA | Solar | 277 MW | Southern Power Co |
| 38.1 mi | Aspiration G Cantua Creek, CA | Solar | 9 MW | AES Distributed Energy |
| 38.3 mi | Firebaugh-CCS-PV-1 Firebaugh, CA | Solar | 1 MW | Mike Woolf Farming |
| 38.5 mi | Giffen Tbd, CA | Solar | 10 MW | Pacific Gas & Electric Co. |
| 39.0 mi | Five Points Pipeline Riverdale, CA | Solar | 4 MW | Maas Energy Works |
| 39.8 mi | Exchequer Snelling, CA | Hydroelectric | 95 MW | Merced Irrigation District |
Power generation near this area
There are 100 power plants within 50 miles of Madera, California (ZIP 93638), with a combined 2,938 MW of nameplate capacity. Solar is the most common fuel type in this area with 75 of the 100 nearby plants. The closest plant is CA - Madera USD - Madera South HS at 6.3 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in California, visit the California state page.
← Search a different location · Printable proximity report →