Power Plants Near 93665 — South Dos Palos, CA
100 power plants within 50 miles of ZIP 93665 (South Dos Palos, California). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 36.9644, -120.6532 · County: Merced
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 1.9 mi | Dos Palos Dos Palos, CA | Solar | 1 MW | Greenbacker Renewable Energy Corporation |
| 2.6 mi | Merced 2 Bess Dos Palos, CA | Battery Storage | — | Zglobal Inc |
| 2.8 mi | Dos Palos Clean Power Dos Palos, CA | Solar | 3 MW | Dos Palos Clean Power, Llc |
| 6.1 mi | Oro Loma Oro Loma, CA | Solar | 20 MW | Consolidated Edison Development Inc. |
| 6.3 mi | Henry Miller Rd Dos Palos, CA | Solar | 2 MW | Henry Miller Reclamation District |
| 6.4 mi | Sun Harvest Solar Ndp1 Dos Palos, CA | Solar | 2 MW | Altus Power America Management, Llc |
| 8.3 mi | Dos Palos Cooperative Gin Dos Palos, CA | Solar | 1 MW | A2b Development Llc Dba Mars Energy Development |
| 9.4 mi | Zeta Solar & Storage Los Banos, CA | Battery Storage | — | Zeta Solar, Llc |
| 9.6 mi | Vega Solar Los Banos, CA | Solar | 20 MW | Vega Solar, Llc |
| 12.5 mi | Merced Bess Los Banos, CA | Battery Storage | — | Zglobal Inc |
| 12.5 mi | Lara 2 Hybrid Los Banos, CA | Battery Storage | — | Zglobal Inc |
| 12.5 mi | Merced 1 Pv Los Banos, CA | Solar | 3 MW | Zglobal Inc |
| 15.1 mi | Godinho Dairy Digester Los Banos, CA | Biomass | — | Aligned Digesters Co., Llc |
| 15.5 mi | East Cleveland Road Solar El Nido, CA | Solar | 3 MW | Rpca Solar 7, Llc |
| 15.9 mi | Diamond H Dairy Power Chowchilla, CA | Biomass | 2 MW | Madera Dp 2, Llc |
| 16.0 mi | Firebaugh-Ccs-Pv-1 Firebaugh, CA | Solar | 1 MW | Mike Woolf Farming |
| 17.1 mi | Wright Solar Park Los Banos, CA | Solar | 200 MW | Wright Solar Park Llc |
| 17.8 mi | El Nido Facility El Nido, CA | Biomass | 13 MW | Merced Power Llc |
| 19.1 mi | Costa View Farms Madera, CA | Solar | 5 MW | 127 Cvf, Llc |
| 20.4 mi | Wonderful Firebaugh Firebaugh, CA | Solar | 5 MW | Wonderful Renewable Energy, Llc. |
| 20.6 mi | Citizen B Mendota, CA | Solar | 5 MW | Aes Distributed Energy |
| 20.9 mi | Wonderful Orchards - New Columbia Firebaugh, CA | Solar | 5 MW | Wonderful Renewable Energy, Llc. |
| 21.1 mi | North Star Solar Mendota, CA | Solar | 62 MW | Southern Power Co |
| 21.1 mi | Adera Solar Chowchilla, CA | Solar | 20 MW | Aes Distributed Energy |
| 21.4 mi | Calrenew-1 Mendota, CA | Solar | 5 MW | Calrenew-1 Llc |
| 21.4 mi | City Of Atwater Nem Atwater, CA | Solar | 2 MW | Socore Energy Llc |
| 21.5 mi | Covanta Mendota Mendota, CA | Biomass | 28 MW | Clean Energy Systems Mendota |
| 21.6 mi | Little Bear Solar 1, Llc Mendota, CA | Solar | 40 MW | Little Bear Solar 1, Llc (Longroad) |
| 21.6 mi | Little Bear 3 Mendota, CA | Solar | 20 MW | Little Bear Solar 3, Llc (Longroad) |
| 21.6 mi | Little Bear 4 Mendota, CA | Solar | 50 MW | Little Bear Solar 4, Llc (Longroad) |
| 21.6 mi | Little Bear 5 Mendota, CA | Solar | 50 MW | Little Bear Solar 5, Llc (Longroad) |
| 21.8 mi | Midway Peaking Llc Firebaugh, CA | Natural Gas | 140 MW | Calpeak Power, Llc |
| 21.9 mi | Wellhead Power Panoche Firebaugh, CA | Natural Gas | 57 MW | Wellhead Services, Inc |
| 21.9 mi | Calpeak Power Panoche Peaker Plant Firebaugh, CA | Natural Gas | 117 MW | Calpeak Power, Llc |
| 21.9 mi | Iron Bess Firebaugh, CA | Battery Storage | — | Panoche Bess Llc |
| 21.9 mi | Midway Bess Firebaugh, CA | Battery Storage | — | Midway Bess Llc |
| 22.0 mi | Panoche Energy Center Firebaugh, CA | Natural Gas | 432 MW | Panoche Energy Center, Llc |
| 22.6 mi | Five H Farms Solar Array Merced, CA | Solar | 1 MW | Maas Energy Works |
| 22.9 mi | Merced Solar Llc Merced, CA | Solar | 2 MW | Ecos Energy Llc |
| 23.0 mi | Mission Solar Llc Merced, CA | Solar | 2 MW | Ecos Energy Llc |
| 23.7 mi | Oneill Los Banos, CA | Hydroelectric | 25 MW | U S Bureau Of Reclamation |
| 23.7 mi | Conflitti Solar Firebaugh, CA | Solar | — | Ces Electron Farm One, Llc |
| 24.4 mi | Ampersand Chowchilla Biomass Llc Chowchilla, CA | Biomass | 13 MW | Ampersand Chowchilla Biomass Llc |
| 24.4 mi | Chowchilla Ii Chowchilla, CA | Natural Gas | 50 MW | California Power Holdings Llc |
| 24.5 mi | W R Gianelli Gustine, CA | Hydroelectric | 424 MW | California Dept. Of Water Resources |
| 24.8 mi | Quinto Solar Pv Project Gustine, CA | Solar | 108 MW | Arevon Energy, Inc. |
| 26.4 mi | Panoche Valley Solar Farm Paicines, CA | Solar | 140 MW | Consolidated Edison Development Inc. |
| 27.2 mi | Gonzaga Ridge Wind Farm Hollister, CA | Wind | — | Gonzaga Ridge Wind Farm, Llc |
| 27.4 mi | City Of Madera Wwtp Madera, CA | Solar | 1 MW | Sune Gil1, Llc |
| 27.6 mi | Madera 1 Pv Madera, CA | Solar | 2 MW | Zglobal Inc |
| 27.6 mi | West Tambo Clean Power Ii Livingston, CA | Solar | 2 MW | West Tambo Clean Power Ii |
| 27.9 mi | Edpr Ca Solar Park Vi Llc (Ca) Hybrid Mendota, CA | Solar | — | Edpr Ca Solar Park Vi Llc |
| 28.0 mi | 2097 Helton Solar Project Merced, CA | Solar | 2 MW | Solarenewal Llc |
| 28.4 mi | Avenue 26 Solar Chowchilla, CA | Solar | 8 MW | Rpca Solar 1, Llc |
| 29.1 mi | Dgs Central California Womens Facility Chowchilla, CA | Solar | 2 MW | Forefront Power, Llc |
| 29.1 mi | Dinosaur Point Los Banos, CA | Wind | 17 MW | International Turbine Res Inc |
| 29.2 mi | Dgs Valley State Prison Chowchilla, CA | Solar | 2 MW | Forefront Power, Llc |
| 29.2 mi | Luna Valley Mendota, CA | Solar | — | Luna Valley Solar I, Llc |
| 29.3 mi | Scarlet Ii Hybrid Cantua Creek, CA | Solar | 350 MW | Edpr Scarlet Ii Llc |
| 29.8 mi | Re Tranquillity Cantua Creek, CA | Solar | 277 MW | Southern Power Co |
| 30.0 mi | Scarlet Solar (Ca) Fresno, CA | Solar | 240 MW | Edp Renewables North America Llc |
| 30.2 mi | Broadway 3 - Uc Merced 1 Merced, CA | Solar | 1 MW | Mn8 Energy Llc |
| 30.2 mi | Ardagh Solar Madera, CA | Solar | — | Kdc Solar Madera, Llc |
| 30.3 mi | Uc Merced Solar Hybrid Merced, CA | Solar | 5 MW | Mn8 Energy Llc |
| 30.4 mi | Kdc Solar Madera Llc Madera, CA | Solar | 10 MW | Valta Energy |
| 30.5 mi | Great Valley Solar Portfolio Holdings, L Cantua Creek, CA | Solar | 203 MW | Consolidated Edison Development Inc. |
| 30.6 mi | Gonzaga Ridge Battery Facility Hollister, CA | Battery Storage | — | Gonzaga Ridge Battery Facility, Llc |
| 31.2 mi | Re Adams East, Llc Fresno, CA | Solar | 19 MW | Onward Energy |
| 31.4 mi | Tranquillity Id Tranquillity, CA | Solar | 1 MW | Tranquillity Solar 1, Llc |
| 31.6 mi | Central 40 Newman, CA | Solar | 40 MW | Central 40, Llc |
| 32.7 mi | Radial Harris Ag 3 Coalinga, CA | Solar | — | Radial Harris Ag 3, Llc |
| 33.0 mi | Aspiration G Cantua Creek, CA | Solar | 9 MW | Aes Distributed Energy |
| 33.0 mi | Sealed Air Madera Solar Project Madera, CA | Solar | 4 MW | Sealed Air Corporation |
| 33.3 mi | Ca - Madera Usd - Madera South Hs Madera, CA | Solar | 1 MW | Forefront Power, Llc |
| 33.5 mi | Madera Community Hospital Madera, CA | Solar | 1 MW | Cleancapital Holdings |
| 34.5 mi | Giffen Solar Park Cantua Creek, CA | Solar | 20 MW | Giffen Solar Park, Llc |
| 34.9 mi | Crystal Farms Local Solar San Joaquin, CA | Solar | 4 MW | Crystal Farms Local Solar, Llc |
| 35.3 mi | Giffen Tbd, CA | Solar | 10 MW | Pacific Gas & Electric Co. |
| 35.7 mi | Radial Harris Ag 1 Coalinga, CA | Solar | — | Radial Harris Ag 1 Llc |
| 36.9 mi | Kingston Energy Storage, Llc Madera, CA | Battery Storage | — | Enel Green Power Na, Inc. |
| 37.3 mi | Parker Snelling, CA | Hydroelectric | 3 MW | Merced Irrigation District |
| 37.7 mi | Turlock Irrigation District Fuel Cell Turlock, CA | Biomass | — | Turlock Irrigation District |
| 37.8 mi | Pacific Ethanol Madera Solar Array Madera, CA | Solar | 4 MW | Seaboard Energy California, Llc |
| 38.3 mi | Borden Solar Farm Madera, CA | Solar | 50 MW | 41mb 8me, Llc |
| 38.5 mi | Walnut Energy Center Turlock, CA | Natural Gas | 301 MW | Turlock Irrigation District |
| 38.7 mi | Fresno Solar San Joaquin, CA | Solar | 3 MW | Wellhead Services, Inc |
| 38.8 mi | Paulsell Crows Landing, CA | Solar | 35 MW | Crow Creek Solar, Llc |
| 38.9 mi | Walnut Turlock, CA | Natural Gas | 50 MW | Turlock Irrigation District |
| 38.9 mi | Fresno Cogen Partners San Joaquin, CA | Natural Gas | 87 MW | Wellhead Services, Inc |
| 38.9 mi | Frontier Solar Llc Newman, CA | Solar | 20 MW | Boralex Us Operations Llc |
| 39.0 mi | Superior Almond Hulling Cantua Creek, CA | Solar | 2 MW | Renewable Solar, Inc |
| 39.6 mi | Covanta Stanislaus Energy Crows Landing, CA | Biomass | 24 MW | Covanta Stanislaus Inc |
| 41.0 mi | Cantua Solar Station Tbd, CA | Solar | 20 MW | Pacific Gas & Electric Co. |
| 41.1 mi | San Joaquin Solar Helm, CA | Solar | 21 MW | Gasna 6p, Llc |
| 41.2 mi | Proxima Crows Landing, CA | Solar | 352 MW | Proxima Solar, Llc |
| 41.5 mi | Helms Energy Center Helm, CA | Natural Gas | — | Wellhead Services, Inc |
| 41.9 mi | Enchanted Rock Turlock Irrigation Distri Patterson, CA | Natural Gas | 47 MW | Enchanted Rock |
| 42.1 mi | Site 980 65 Madera, CA | Hydroelectric | 2 MW | Madera-Chowchilla Power Auth |
| 42.5 mi | Enerparc Ca1 Llc Hollister, CA | Solar | 2 MW | Enerparc Ca 1, Llc |
| 42.5 mi | Merced Falls Snelling, CA | Hydroelectric | 3 MW | Merced Irrigation District |
Power generation near this area
There are 100 power plants within 50 miles of South Dos Palos, California (ZIP 93665), with a combined 4,330 MW of nameplate capacity. Solar is the most common fuel type in this area with 68 of the 100 nearby plants. The closest plant is Dos Palos at 1.9 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in California, visit the California state page.
← Search a different location · Printable proximity report →