Power Plants Near 95341 — Merced, CA
100 power plants within 50 miles of ZIP 95341 (Merced, California). Click any plant for capacity, generation, emissions, and generator-level detail.
Centroid: 37.2308, -120.5144 · County: Merced
| Distance | Plant | Fuel | Capacity | Operator |
|---|---|---|---|---|
| 3.0 mi | Merced Solar Llc Merced, CA | Solar | 2 MW | Ecos Energy Llc |
| 3.1 mi | Mission Solar Llc Merced, CA | Solar | 2 MW | Ecos Energy Llc |
| 3.3 mi | El Nido Facility El Nido, CA | Biomass | 13 MW | Merced Power Llc |
| 7.0 mi | City Of Atwater Nem Atwater, CA | Solar | 2 MW | Socore Energy Llc |
| 8.0 mi | East Cleveland Road Solar El Nido, CA | Solar | 3 MW | Rpca Solar 7, Llc |
| 8.4 mi | 2097 Helton Solar Project Merced, CA | Solar | 2 MW | Solarenewal Llc |
| 10.3 mi | Broadway 3 - Uc Merced 1 Merced, CA | Solar | 1 MW | Mn8 Energy Llc |
| 10.4 mi | Uc Merced Solar Hybrid Merced, CA | Solar | 5 MW | Mn8 Energy Llc |
| 12.1 mi | Dos Palos Cooperative Gin Dos Palos, CA | Solar | 1 MW | A2b Development Llc Dba Mars Energy Development |
| 12.9 mi | Adera Solar Chowchilla, CA | Solar | 20 MW | Aes Distributed Energy |
| 13.9 mi | Henry Miller Rd Dos Palos, CA | Solar | 2 MW | Henry Miller Reclamation District |
| 14.1 mi | Radial Harris Ag 3 Coalinga, CA | Solar | — | Radial Harris Ag 3, Llc |
| 14.2 mi | Sun Harvest Solar Ndp1 Dos Palos, CA | Solar | 2 MW | Altus Power America Management, Llc |
| 14.4 mi | Five H Farms Solar Array Merced, CA | Solar | 1 MW | Maas Energy Works |
| 14.4 mi | West Tambo Clean Power Ii Livingston, CA | Solar | 2 MW | West Tambo Clean Power Ii |
| 16.8 mi | Diamond H Dairy Power Chowchilla, CA | Biomass | 2 MW | Madera Dp 2, Llc |
| 16.9 mi | Chowchilla Ii Chowchilla, CA | Natural Gas | 50 MW | California Power Holdings Llc |
| 17.0 mi | Ampersand Chowchilla Biomass Llc Chowchilla, CA | Biomass | 13 MW | Ampersand Chowchilla Biomass Llc |
| 17.2 mi | Dos Palos Clean Power Dos Palos, CA | Solar | 3 MW | Dos Palos Clean Power, Llc |
| 17.5 mi | Parker Snelling, CA | Hydroelectric | 3 MW | Merced Irrigation District |
| 17.7 mi | Radial Harris Ag 1 Coalinga, CA | Solar | — | Radial Harris Ag 1 Llc |
| 17.9 mi | Merced 2 Bess Dos Palos, CA | Battery Storage | — | Zglobal Inc |
| 18.3 mi | Dos Palos Dos Palos, CA | Solar | 1 MW | Greenbacker Renewable Energy Corporation |
| 19.9 mi | Avenue 26 Solar Chowchilla, CA | Solar | 8 MW | Rpca Solar 1, Llc |
| 20.2 mi | Costa View Farms Madera, CA | Solar | 5 MW | 127 Cvf, Llc |
| 20.8 mi | Godinho Dairy Digester Los Banos, CA | Biomass | — | Aligned Digesters Co., Llc |
| 21.8 mi | Dgs Valley State Prison Chowchilla, CA | Solar | 2 MW | Forefront Power, Llc |
| 22.3 mi | Dgs Central California Womens Facility Chowchilla, CA | Solar | 2 MW | Forefront Power, Llc |
| 22.6 mi | Merced Falls Snelling, CA | Hydroelectric | 3 MW | Merced Irrigation District |
| 22.6 mi | Madera 1 Pv Madera, CA | Solar | 2 MW | Zglobal Inc |
| 23.0 mi | Mcswain Snelling, CA | Hydroelectric | 9 MW | Merced Irrigation District |
| 25.9 mi | Oro Loma Oro Loma, CA | Solar | 20 MW | Consolidated Edison Development Inc. |
| 26.0 mi | Merced Bess Los Banos, CA | Battery Storage | — | Zglobal Inc |
| 26.1 mi | Merced 1 Pv Los Banos, CA | Solar | 3 MW | Zglobal Inc |
| 26.1 mi | Lara 2 Hybrid Los Banos, CA | Battery Storage | — | Zglobal Inc |
| 26.1 mi | Turlock Irrigation District Fuel Cell Turlock, CA | Biomass | — | Turlock Irrigation District |
| 26.7 mi | Turlock Lake Hickman, CA | Hydroelectric | 3 MW | Turlock Irrigation District |
| 27.0 mi | Vega Solar Los Banos, CA | Solar | 20 MW | Vega Solar, Llc |
| 27.4 mi | Zeta Solar & Storage Los Banos, CA | Battery Storage | — | Zeta Solar, Llc |
| 27.5 mi | Walnut Energy Center Turlock, CA | Natural Gas | 301 MW | Turlock Irrigation District |
| 27.9 mi | Exchequer Snelling, CA | Hydroelectric | 95 MW | Merced Irrigation District |
| 27.9 mi | Walnut Turlock, CA | Natural Gas | 50 MW | Turlock Irrigation District |
| 28.1 mi | City Of Madera Wwtp Madera, CA | Solar | 1 MW | Sune Gil1, Llc |
| 28.8 mi | Wright Solar Park Los Banos, CA | Solar | 200 MW | Wright Solar Park Llc |
| 29.1 mi | Upper Dawson La Grange, CA | Hydroelectric | 4 MW | Turlock Irrigation District |
| 29.3 mi | Wonderful Firebaugh Firebaugh, CA | Solar | 5 MW | Wonderful Renewable Energy, Llc. |
| 29.8 mi | Hickman Hickman, CA | Hydroelectric | 1 MW | Turlock Irrigation District |
| 30.1 mi | Wonderful Orchards - New Columbia Firebaugh, CA | Solar | 5 MW | Wonderful Renewable Energy, Llc. |
| 30.4 mi | Quinto Solar Pv Project Gustine, CA | Solar | 108 MW | Arevon Energy, Inc. |
| 30.6 mi | La Grange La Grange, CA | Hydroelectric | 5 MW | Turlock Irrigation District |
| 30.8 mi | Oneill Los Banos, CA | Hydroelectric | 25 MW | U S Bureau Of Reclamation |
| 30.9 mi | Kdc Solar Madera Llc Madera, CA | Solar | 10 MW | Valta Energy |
| 31.0 mi | Ardagh Solar Madera, CA | Solar | — | Kdc Solar Madera, Llc |
| 32.0 mi | Sealed Air Madera Solar Project Madera, CA | Solar | 4 MW | Sealed Air Corporation |
| 32.1 mi | Ca - Madera Usd - Madera South Hs Madera, CA | Solar | 1 MW | Forefront Power, Llc |
| 32.4 mi | Central 40 Newman, CA | Solar | 40 MW | Central 40, Llc |
| 32.6 mi | Don Pedro La Grange, CA | Hydroelectric | 171 MW | Turlock Irrigation District |
| 32.6 mi | Madera Community Hospital Madera, CA | Solar | 1 MW | Cleancapital Holdings |
| 32.9 mi | W R Gianelli Gustine, CA | Hydroelectric | 424 MW | California Dept. Of Water Resources |
| 33.7 mi | Calrenew-1 Mendota, CA | Solar | 5 MW | Calrenew-1 Llc |
| 33.8 mi | Covanta Mendota Mendota, CA | Biomass | 28 MW | Clean Energy Systems Mendota |
| 34.7 mi | Firebaugh-Ccs-Pv-1 Firebaugh, CA | Solar | 1 MW | Mike Woolf Farming |
| 35.1 mi | North Star Solar Mendota, CA | Solar | 62 MW | Southern Power Co |
| 35.1 mi | Almond Power Plant Modesto, CA | Natural Gas | 224 MW | Turlock Irrigation District |
| 35.3 mi | Citizen B Mendota, CA | Solar | 5 MW | Aes Distributed Energy |
| 35.4 mi | Frontier Solar Llc Newman, CA | Solar | 20 MW | Boralex Us Operations Llc |
| 35.5 mi | Paulsell Crows Landing, CA | Solar | 35 MW | Crow Creek Solar, Llc |
| 35.7 mi | Gonzaga Ridge Wind Farm Hollister, CA | Wind | — | Gonzaga Ridge Wind Farm, Llc |
| 35.8 mi | Mcclure Modesto, CA | Natural Gas | 142 MW | Modesto Irrigation District |
| 35.9 mi | Site 980 65 Madera, CA | Hydroelectric | 2 MW | Madera-Chowchilla Power Auth |
| 36.0 mi | Little Bear Solar 1, Llc Mendota, CA | Solar | 40 MW | Little Bear Solar 1, Llc (Longroad) |
| 36.0 mi | Little Bear 3 Mendota, CA | Solar | 20 MW | Little Bear Solar 3, Llc (Longroad) |
| 36.0 mi | Little Bear 4 Mendota, CA | Solar | 50 MW | Little Bear Solar 4, Llc (Longroad) |
| 36.0 mi | Little Bear 5 Mendota, CA | Solar | 50 MW | Little Bear Solar 5, Llc (Longroad) |
| 36.1 mi | Covanta Stanislaus Energy Crows Landing, CA | Biomass | 24 MW | Covanta Stanislaus Inc |
| 36.1 mi | Kingston Energy Storage, Llc Madera, CA | Battery Storage | — | Enel Green Power Na, Inc. |
| 36.5 mi | Borden Solar Farm Madera, CA | Solar | 50 MW | 41mb 8me, Llc |
| 36.7 mi | Enchanted Rock Turlock Irrigation Distri Patterson, CA | Natural Gas | 47 MW | Enchanted Rock |
| 37.0 mi | Pacific Ethanol Madera Solar Array Madera, CA | Solar | 4 MW | Seaboard Energy California, Llc |
| 37.5 mi | Proxima Crows Landing, CA | Solar | 352 MW | Proxima Solar, Llc |
| 38.3 mi | Dinosaur Point Los Banos, CA | Wind | 17 MW | International Turbine Res Inc |
| 39.1 mi | Gonzaga Ridge Battery Facility Hollister, CA | Battery Storage | — | Gonzaga Ridge Battery Facility, Llc |
| 39.4 mi | Amazon - Patterson Pv Patterson, CA | Solar | 3 MW | Aes Distributed Energy |
| 39.8 mi | Central Valley Ag Power Oakdale, CA | Biomass | 2 MW | Central Valley Ag Power Llc |
| 40.0 mi | Midway Peaking Llc Firebaugh, CA | Natural Gas | 140 MW | Calpeak Power, Llc |
| 40.0 mi | Wellhead Power Panoche Firebaugh, CA | Natural Gas | 57 MW | Wellhead Services, Inc |
| 40.1 mi | Calpeak Power Panoche Peaker Plant Firebaugh, CA | Natural Gas | 117 MW | Calpeak Power, Llc |
| 40.1 mi | Iron Bess Firebaugh, CA | Battery Storage | — | Panoche Bess Llc |
| 40.1 mi | Midway Bess Firebaugh, CA | Battery Storage | — | Midway Bess Llc |
| 40.2 mi | Panoche Energy Center Firebaugh, CA | Natural Gas | 432 MW | Panoche Energy Center, Llc |
| 40.2 mi | Woodland Modesto, CA | Natural Gas | 199 MW | Modesto Irrigation District |
| 41.1 mi | Aurora Renewable Energy (Hybrid) West Modesto, CA | Battery Storage | — | Vesper Energy Development Llc |
| 41.4 mi | Erock Mid Claribel Generation Station Modesto, CA | Natural Gas | 48 MW | Enchanted Rock |
| 41.7 mi | Moccasin Moccasin, CA | Hydroelectric | 100 MW | City & County Of San Francisco |
| 41.8 mi | Conflitti Solar Firebaugh, CA | Solar | — | Ces Electron Farm One, Llc |
| 42.0 mi | Moccasin Low Head Hydro Project Moccasin, CA | Hydroelectric | 3 MW | City & County Of San Francisco |
| 42.5 mi | Edpr Ca Solar Park Vi Llc (Ca) Hybrid Mendota, CA | Solar | — | Edpr Ca Solar Park Vi Llc |
| 42.9 mi | Tranquillity Id Tranquillity, CA | Solar | 1 MW | Tranquillity Solar 1, Llc |
| 43.7 mi | Axium Modesto Solar Modesto, CA | Solar | 25 MW | Axium Us Solar Holdings Llc |
| 44.0 mi | Scarlet Ii Hybrid Cantua Creek, CA | Solar | 350 MW | Edpr Scarlet Ii Llc |
Power generation near this area
There are 100 power plants within 50 miles of Merced, California (ZIP 95341), with a combined 4,307 MW of nameplate capacity. Solar is the most common fuel type in this area with 55 of the 100 nearby plants. The closest plant is Merced Solar Llc at 3.0 miles.
Nameplate capacity is the maximum output a plant can produce under ideal conditions — actual generation depends on fuel availability, demand, and maintenance schedules. Capacity factor (shown on individual plant pages) measures how much of that theoretical maximum a plant actually delivers over a year. Nuclear plants typically run above 90%; solar and wind range from 20–45% depending on location and weather.
All data comes from federal EIA and EPA releases. For a printable version of this proximity search, use the report link below. To explore all plants in California, visit the California state page.
← Search a different location · Printable proximity report →